Site work for a water / sewer project in New York, New York. Completed plans call for site work for a water / sewer project.
CSO-GC-SFS-OH-CP2: Second construction phase (CP2) in the overall construction of the OH-007 Gowanus Canal CSO Facility. During this CP2 phase, the below grade substructure of this facility will be constructed. In order to accomplish this, a cement-bentonite support-of-excavation groundwater-cutoff slurry wall will be constructed around the perimeter of the new facility along with braces across the footprint of the Facility. This will be followed by the excavation of soil within this perimeter where the new substructure will be built. Due to past industrial use of the site, the soil to be excavated is contaminated with hazardous materials. Therefore, soil testing will be required to determine how to dispose of it, treat it, or reuse it. Air emissions will need to be closely monitored using a Community Air Monitoring Program to ensure that hazardous air contaminants are not released into the surrounding community during the excavation process. Additionally, a construction water treatment system will need to be constructed in order to treat and discharge groundwater that may be contaminated. Following excavation the water-retaining substructure will be constructed using cast-in-place concrete to provide durability, watertightness, and structural integrity. The substructure will include a screening area, five storage cells, an effluent channel, and a pump wet well to pump the stored CSO back to the main interceptor sewer in the area. This new substructure will have the capacity to store four million gallons of CSO. Question Deadline 10/06/2023 All questions must be submitted in the "Discussion with Buyer" forum in PASSPort. All questions and requests for additional information should be submitted through the PASSPort Disc *This project has been awarded and all trades have been let.
Under Construction
Water / Sewer
$312,086,363.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 29, 2023
July 22, 2024

2nd Avenue,, New York, NY
Related To This Project
New York, NY
Bid Date: Oct 10 2023
New York, NY
Bid Date: Oct 10 2023
New York, NY
Bid Date: Oct 24 2023
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Nov 06 2023
New York, NY
Bid Date: Sep 27 2023
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Feb 29 2024
New York, NY
Bid Date: Mar 19 2024
New York, NY
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Construction of CSO Facilities for Gowanus Canal - Construction Package 2 (Oh-007)
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.