BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Omaha, Nebraska. Completed plans call for the renovation of a municipal facility.

The contractor shall furnish all necessary labor, material, equipment and supervison to replace cameras in the IRS first floor space at the Edward Zorinsky Federal Building, 1616 Capitol Avenue, Omaha, NE. A detailed Statement of Work (SOW) is attached. PoP: 10/31/2023 - 01/29/2024 10/02/2023 RFI Due Date: Monday, October 2, 2023 The Contractor shall furnish all necessary labor, material, equipment, and supervision to replace 12 existing analog cameras and associated coax cables with digital IP cameras and Cat6e cables for the Department of Treasury, Internal Revenue Service in accordance with contract specifications. A complete scope of work is attached. Please submit a fully completed SF1442, detailed price breakout with a signed proposal that should include, but not to, if applicable, the estimated labor hours and wage rate, material cost, equipment cost, subcontractor fee and overhead and profit rate. All work is to be performed at the the Edward Zorinsky Federal Building, 1616 Capitol Ave, Omaha, NE 68102. The current wage determinations are attached. Offers to be valid for 60 . Site visits will be conducted by appointment only. To arrange for a site visit, contact Dave Smith at 402.203.4880 or : Dave.Smith@gsa.gov The estimated price range for the Project is between $25,000.00 and $100,000.00. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document. INSTALLATION: Installation includes all work and materials necessary for a full and complete system. Installation may include, but not be limited to the following: a) Electrical power to all devices. b) All wiring, conductor, conduits, and connections. c) VSS, Access Control, IDS (intrusion detection system), duress and any other physical security system tie-ins. d) Floor prep, flooring, walls and ceiling finish work. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Municipal

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
33
Bidding Soon
525
All Active Projects
216
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2023

November 9, 2023

img_map_placeholder

1616 Capitol Ave, Omaha, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.