EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 7, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a military facility in Erie, Pennsylvania. Completed plans call for the renovation of a military facility.

The Federal Aviation Administration (FAA) has a requirement for the HVAC Replacement in Erie PA. Please see attachments for specifics. The Contractor shall provide all labor, materials, equipment, transportation, insurance, notifications, licenses, permits, fees, and supervision necessary to perform the work described in the attached of Work and other attachments posted to this announcement. The Acquisition Management System (AMS) applies to FAA in place of the Federal Acquisition Regulation (FAR) and various other provisions of Federal acquisition law. It is anticipated that a firm-fixed-price type construction contract will be awarded as a result of this solicitation (SIR). All questions regarding the project/ of work/plans must be received in writing to Turner Hart @ turner.m.hart@faa.gov no later than 5:00 p.m. CST on October 6, 2023 to allow for responses to be provided prior to due date for receipt of proposals. Contractors must be registered with the System for Award Management, www.sam.gov on the date established for receipt of offers October 06, 2023. Reference AMS Clause 3.3.1-33, paragraph (d), if the offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer may proceed to award to the next otherwise successful registered Offeror. In addition, offerors must complete and return the attached forms by closing date. The forms are provided as separate documents under this announcement. The FAA reserves the right to review and verify each offeror's program eligibility. E-mailed proposals must be received by Turner Hart, @ turner.m.hart@faa.gov, no later than 5:00 p.m. CST, October 06, 2023 and must contain 6973GH-23-Q-00279 as part of the e-mail subject line. A will be held on 09/27 at 1:00PM local time. Please contact Turner Hart @ turner.m.hart@faa.gov for more information. Any responses received after 5:00 p.m. CST, October 06, 2023, may not be considered in accordance with AMS provision 3.2.2.3-14, Late Submissions, Modifications, and Withdrawals of submittal vendor's response may be determined ineligible. As the FAA does not utilize sealed bidding contracting techniques, a public bid opening will not be held. Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the SIR process. This SIR/RFO is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for of any costs attributed to the preparation and submission of proposals. Inquiries regarding this SIR/RFO should be directed to Turner Hart, Contract Specialist, @ turner.m.hart@faa.gov. The estimated price range of this procurement is between $149,999.00 - $249,999.00. This acquisition is Set Aside for Total Small Business. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$249,999.00

Public - Federal

Renovation

15

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Stairs
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Access Doors and Panels, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Turning Vanes, Flexible Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Trenching
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
107
Bidding Soon
1,264
All Active Projects
563
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2023

November 6, 2023

img_map_placeholder

To Be Determined, Erie, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Replacement Erie PA

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.