BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Defiance, Ohio. Conceptual plans call for site work for a water / sewer project.

Contact Estee Miller, Program Manager, at (419) 784-3882 with any inquiries regarding the project. Design: October-November 2023 Pre-Construction: January 2024 Construction: February 2024-February 2025 Interested firms should provide a statement of qualifications and should include at minimum the following: o Firm Name, address, telephone number, and contact person o Number of years in Business o Types of services offered o Brief (2-page maximum) description of the project understanding. Include information/concerns regarding permits, schedule, site, etc. o Background on key technical personnel o Examples of similar projects designed by the firm o Projects currently underway E-mail submissions will be accepted. Introduction The Paulding County Commissioners are seeking statements of qualifications from interested firms to enter into a contract for design and engineering services in connection with the Grover Hill Waste Water Treatment Plant. All firms interested should reply with a statement of qualifications. The Scope of work includes the (a) the design, bid and contract administration, (b) PTI permitting and fees, and (c) construction observation Preliminary Project Description As currently constructed, the Grover Hill Wastewater Treatment Plant is not capable of reliably disinfecting the Village residents' wastewater. Currently, wastewater leaves a residence and solids are collected into a Village owned septic tank. Liquid effluent leaves the tank, enters the sanitary sewer system, and is collected at a lift station. The lift station pumps the wastewater to the WWTP. At the WWTP, wastewater is deposited into an aeration basin to biologically break down the wastewater. Then, it enters two clarifying basins that settle the broken down solids. Next, the clear water slowly flows out of the plant at a low grade and contacts chlorine tablets to disinfect the water. The water is then treated with sulfur dioxide to dechlorinate it so that it doesn't kill the ecosystem of West Branch Prairie Creek. The Village is seeking to replace the chlorination/dichlorination system with a UV disinfection system and to convert the old polishing basin into an equalization basin to allow for additional wet-weather storage capacity at the WWTP.

Conceptual

Water / Sewer

$639,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
49
Bidding Soon
1,004
All Active Projects
452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

img_map_placeholder

Multiple Locations, Defiance, OH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.