BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a water / sewer project in Elk Grove, California. Completed plans call for the renovation of a water / sewer project.

Bid bond/deposit not less than ten (10) percent of the aggregate total bid must be submitted with the sealed bid. Successful Bidder must furnish a 100 percent Performance Bond and Payment Bond per Appendix D and Appendix E respectively. Regional San reserves the right to reject any or all bids and waive any irregularity in bids received. The Echo Water Resource Recovery Facility provides wastewater treatment to the Sacramento area and surrounding cities, serving approximately 1.6 million customers. The Echo Water Facility currently uses a Tertiary Treatment process and the treated effluent is discharged into the Sacramento River near the town of Freeport. Question Due Date: October 10th, 2023 Project Completion: 60 working days after Notice to Proceed sealed bids to provide all labor and materials necessary for RFB # 8460 MS Tank #2 Concrete & Piping Repair Project located at 8521 Laguna Station Road, Elk Grove, CA 95758. The EchoWater Resource Recovery Facility provides wastewater treatment to the Sacramento area and surrounding cities, serving approximately 1.6 million customers. The EchoWater Facility currently uses a Tertiary Treatment process and the treated effluent is discharged into the Sacramento River near the town of Freeport. The EchoWater Facility uses Mixed Sludge (MS) process tanks that were originally built in the early 1990's to store mixed sludge at an elevated temperature until the sludge can be taken into a digester. MS Tank #2 is made up of reinforced concrete over the bottom 2/3, while the top 1/3 is constructed from carbon steel. This project involves repairing delaminated concrete and concrete pop outs on the tank exterior as well as repairing a section of coating on the concrete interior. Additionally, a portion of the piping on the exterior of the tank needs to be replaced. Questions regarding this bid should be referred to: Tamblynn Stewart Senior Contract Services Officer (916) 875-9014 stewartt@sacsewer.com Questions regarding drawings and specifications shall be referred to: Aaron Bihlman Associate Civil Engineer (916) 875-9214 bihlmana@sacsewer.com

Award

Water / Sewer

$66,743.00

Public - County

Renovation

11

8

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
14
Bidding Soon
1,930
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2023

October 27, 2023

Project location map

8521 Laguna Station Rd, Elk Grove, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.