Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Fitchburg, Massachusetts. Completed plans call for the renovation of a educational facility.
Curtain install and rigging at Memorial Middle School. Question Deadline 10/05/2023 All information with respect to this solicitation shall be directed through the Mary A. Delaney Chief Procurement Officer, including questions, clarifications, or observations. Bidder shall not contact any City employee, agent, official, department, department head, or agent with regards to this solicitation. Doing so may lead to i disqualification of the bid. STAGE CURTAINS & TRACKS - The FPS is seeking to replace the original (1967) auditorium rigging/chain support and curtains in the Memorial Middle School with modern, inherently flame-retardant, polyster velour valance, traveler, border, and side leg curtains and related rigging chains and hardware. 1. Vendor shall refurbish and/or replace existing tracks, replacing damaged/worn parts as necessary. Replace all operating hardware on the existing tracks for Main Traveler, Rear Traveler and Legs, to include new Live and deadend pulleys, master carriers, slave carriers, tensioned floor pulleys and operating cords. 2. Relocate the existing projection screen as necessary to accommodate for new locations of curtains. 3. Install one (1) Main Valance Curtain panel at minimum quality specification of 20oz velour and color (TBD) 6'h x 40'w. The fabric must be inherently flame-retardant polyester velour, color - (TBD). To be sewn with 50% fullness using box pleats with appropriately sized top, side, and bottom hems. 4. Install two (2) Bi-Parting panels for the main curtain at minimum quality specification of 20oz velour and color TBD - 18'h x 23'w. The fabric must be inherently flame-retardant polyester velour, color TBD. Panels will be sewn with 50% fullness using grommet-in pleats. 5. Install four (4) Border Curtain panels at a minimum quality specification of 20oz inherently flame-retardant polyester velour, color TBD - 6'h x 40'w. Panel will be sewn with 50% fullness using box pleats. Top hem to have appropriately sized Nylon webbing with appropriate tie lines, side hems and a bottom hem. 6. Install three (3) pairs of Side Leg Curtain panels at a minimum quality specification of 20oz inherently flameretardant polyester velour, color - TBD - 18'h x 7'w. Panels will be sewn with 50% fullness using box pleats. Top hem to have appropriately sized Nylon webbing with s-hooks, side hems and a bottom hem with a separately sewn internal chain pocket. 7. Install two (2) Bi-parting Mid Draw panels at a minimum quality specification of 20oz inherently flame-retardant polyester velour, color - TBD - 18'h x 23'w. Panels will be sewn with 50% fullness using grommet-in pleats. Top hem to have appropriately sized Nylon webbing with brass grommets and s-hooks, side hems and bottom hem with a separately sewn internal chain pocket. 8. Install two (2) Bi-parting Rear Curtain panels at a minimum quality specification of 20oz inherently flame-retardant polyester velour, color - TBD - 18'h x 23'w. Panels will be sewn with 50% fullness using grommet-in pleats. Top hem to have appropriately sized Nylon webbing with brass grommets and s-hooks, side hems and bottom hem with a separately sewn internal chain pocket. 9. Replace the following for the rigging/chain support system. o all chain support for the rigging system with 3/16" proof coil chain, rated for overhead support; o New rated beam clamps to attach to the existing trusses o Connection points at both beam clamp and pipe/track with rated bolts and/or rated pin shackles (as applicable). o Pipe to be changed to schedule 40 1.5" iron pipe (painted black) with 18" internal support sleeves at splices and secured with lock nuts. o Tracks - change all carriers, cord, both end pulleys on each track and provide new floor pulleys.
Award
Educational
$56,418.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 12, 2023
November 13, 2023
615 Rollstone St, Fitchburg, MA
Related To This Project
Fitchburg, MA
Bid Date: Oct 11 2023
Fitchburg, MA
Bid Date: Oct 11 2023
Fitchburg, MA
Bid Date: Oct 26 2023
Fitchburg, MA
Bid Date: Dec 05 2023
Fitchburg, MA
Bid Date: Nov 08 2023
Fitchburg, MA
--
Fitchburg, MA
Bid Date: Nov 14 2023
Fitchburg, MA
Bid Date: Dec 12 2023
Fitchburg, MA
--
Fitchburg, MA
--
Fitchburg, MA
--
Fitchburg, MA
--
Fitchburg, MA
Bid Date: Jan 31 2024
Fitchburg, MA
Bid Date: Sep 27 2023
Fitchburg, MA
Bid Date: Aug 31 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.