BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a playground / park / athletic field in Cambridge, Massachusetts. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Lowell Memorial Park:Site preparation, grading, pathway paving, wall repair, tree removal and pruning, planting, irrigation, lighting, and site furnishings Written Questions shall be submitted BY October 13, 2023 at 12:00PM to: Attn: Wendy Pearl, Project Manager The proposed contract includes a combined requirement of 10.4% of the bid price for minority-owned business enterprises and women-owned business enterprises. Proposed MBE/WBE plans that include solely MBE or solely WBE , or do not include a reasonable amount by both MBE and WBE firms to meet the combined requirements, will not be considered responsive. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. The Commonwealth requires participation of Veteran-Owned Business Enterprises ("VOBE") on its construction projects. The Veteran-Owned Business Enterprise participation benchmark for this contract is 3.0%. Work covered by this contract includes but may not be limited to site-work; construction; reconstruction; alterations; remodeling or repair of the public works Project described in this paragraph 1.03 including the following major work: 1. Turf improvements 2. Removal of existing, dead, dying, or other trees 3. Selective pruning of existing trees to remain 4. Installation of tree, shrubs, and groundcover plantings 5. Installation of new site lighting, including electrical conduit 6. Installation of site furnishings, including signage 7. Installation of concrete walkways 8. Restoration/rebuilding of existing brick walls & pier with limestone capstones 9. Substantial Completion date is September 30, 2024 10. Final Completion date is December 15, 2024.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,220,710.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
146
Bidding Soon
2,778
All Active Projects
1,172
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2023

January 1, 2024

img_map_placeholder

Fresh Pond Pkwy & Brattle St, Cambridge, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.