BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a civil project in Brighton, Michigan. Completed plans call for the renovation of a water / sewer project.

As of February 1, 2024, project was awarded to Comprehensive Contracting, awarded amount is $496,305.50. Reference Number 0000336857 ITB: No- #ITB-WW-23-04 The City of Brighton, Michigan desires to employ the services of a contractor, or contractors, to rehabilitate three sanitary sewer lift stations located in the Pine Creek Ridge Subdivision. Work will vary depending on each lift station's needs. The Base Bid consists of the refurbishment of the Hidden Pines (Pine Creek #1) and Arbor Bay (Pine Creek #2) lift stations with the Wyndam (Pine Creek #3) lift station submitted as an alternate bid. Question Acceptance Deadline 01/11/2024 04:00 PM EST Questions are submitted online Yes -- All questions must be submitted via email (brooksc@brightoncity.org) General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % * Hidden Pines (Pine Creek #1) Installation of two (2) new pumps. Installation of two (2) new 5HP electric motors. Installation of two (2) new motor/pump couplings. Replace pump suction and discharge valves (4 total) Replace pump check valves (2 total) Replace all pressure gauges and their related pipe and valves. Install two (2) new motor starters/contactors. Replace main breakers on 2 pump motors. Replace 120v breakers. Replace all control relays and phase monitors in control panel. Replace alternator in control panel. Replace HOA switches. Replace current level control system with a level transducer. Add redundant high level and low level floats in the wet well. Replace mechanical seal water system. If new seal system requires the use of air compressors like the current system, remove existing air compressors, and install new unit(s), otherwise remove existing air compressors and related equipment. Replace proximity sensors on two check valves. Remove air driven discharge valve and replace it with pipe. Replace ventilation fan and motor. Replace dehumidifier. Replace general purpose wall mounted transformer in dry pit. Replace manual transfer switch and circuit breaker. Once work is complete the contractor will test pumps to ensure proper operation. Check voltage and amperage readings. Adjust level controls and ensure the system is working properly. Clean and prep metal pipework for recoating/repainting. Coatings shall be a two-component epoxy coating and shall meet or exceed original coating specifications. Clean and prep floor and walls of the station for recoating/repainting. Coatings shall be a two-component epoxy coating and shall meet or exceed original coating specifications. Sandblasting/grinding may be required on areas with heavy corrosion. This will be determined by City staff. * Arbor Bay (Pine Creek #2) Installation of two (2) new pumps. Installation of two (2) new 5HP electric motors. Installation of two (2) new motor/pump couplings. Replace pump suction and discharge valves (4 total) Replace pump check valves (2 total) Replace all pressure gauges and their related pipe and valves. Install two (2) new motor starters/contactors. Replace main breakers on 2 pump motors. Replace 120v breakers. Replace all control relays and phase monitors in control panel. Replace alternator in control panel. Replace current level control system with a level transducer. Add redundant high level and low level floats in the wet well. Remove air compressor and related equipment. Replace seal water filter components with new equipment. Replace proximity sensors on two check valves. Remove existing flow meter and replace it with pipe. Replace ventilation fan and motor. Replace dehumidifier. Replace general purpose wall mounted transformer in dry pit. Replace manual transfer switch and circuit breaker. Once work is complete the contractor will test pumps to ensure proper operation. Check voltage and amperage readings. Adjust level controls and ensure the system is working properly. Clean and prep metal pipework for recoating/repainting. Coatings shall be a two-component epoxy coating and shall meet or exceed original coating specifications. Clean and prep floor and walls of the station for recoating/repainting. Coatings shall be a two-component epoxy coating and shall meet or exceed original coating specifications. Sandblasting/grinding may be required on areas with heavy corrosion. This will be determined by city staff. ALTERNATE BID: Wyndam (Pine Creek #3) Installation of two (2) new Gorman Rupp T4A-B pump assemblies. Replace pump suction and discharge valves (4 total) Replace pump check valves (2 total) Install two (2) new motor starters/contactors. Replace main breakers on 2 pump motors. Replace 120v breakers. Replace all control relays and phase monitors in control panel. Replace alternator in control panel. Install new ventilation fan and motor. Install two new air compressors for level control system. Replace manual transfer switch and circuit breaker. Once work is complete the contractor will test pumps to ensure they are operating properly Check voltage and amperage readings. Clean and prep pumps and metal pipework for recoating/repainting. Coatings shall be a two-component epoxy coating and shall meet or exceed original coating specifications. Sandblasting/grinding may be required on areas with heavy corrosion. This will be determined by City Staff. Lift Station PS-6 Pine Creek No. 1 PS Location; 5397 Hidden Pines Drive Lift Station PS-11 Pine Creek 3 Rd PS Location: 5642 Wyndam Lane The project shall be substantially completed by September 1, 2024

Award

Water / Sewer

$496,306.00

Public - City

Renovation

9

3

4

5

Subscribe For Documents

87 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
107
Bidding Soon
1,487
All Active Projects
631
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

February 15, 2024

img_map_placeholder

Multiple Locations, Brighton, MI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.