BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 28, 2023 at 8:00 PM

Updated January 29, 2024

Renovation of an educational facility in Hazlehurst, Mississippi. Completed plans call for the renovation of a educational facility.

Contractor shall provide all labor, materials, equipment, supplies, taxes, insurance, fuels, permits, retirement of utilities, and any and all other items necessary to complete the work and disposal of materials and related work, as specified herein. Contractor shall complete all work (demolition, installation, and site cleanup). 2. Investigation of Conditions: Before submitting a bid, Bidders should carefully examine the specifications and visit the site to fully understand the scope of work. HCSD is committed to continue in its work to keep the Districts facilities updated and operating in an efficient manner. The proposed services will require certified, licensed contractors to execute the project and to assure that all work is conducted according the laws, regulations codes that govern our State Department of Education, building codes, mechanical codes and the Mississippi Contractors Board. Location of Project: 101 S. Haley St., Hazlehurst, MS 39083 Questions regarding this solicitation should be directed to Mr. Cloyd Garth, Jr. Superintendent of Education, by email at cqarth@hazlehurst.k12.ms.us or by phone at (601) 894-1152. Hazlehurst City School District shall select lowest and best bidder. HCSD reserves the right to reject any and all Proposals and to waive irregularities and informalities in the submittal and evaluation process. This solicitation for Construction Services does not obligate HCSD to pay any costs incurred by respondents in the preparation and submission of a Proposal. HCSD is committed to continue in its work to keep the Districts facilities updated and operating in an efficient manner. The proposed services will require certified, licensed contractors to execute the project and to assure that all work is conducted according the laws, regulations codes that govern our State Department of Education, building codes, mechanical codes and the Mississippi Contractors Board. The project is summarized as follows: SCOPE OF WORK 1. Pre-Installation Assessment: Conduct an initial assessment of the HVAC system to determine the appropriate type and capacity of ionization technology required. 2. Equipment Service: Clean, service, replace belts as needed, replace all filters, clean coils on all equipment no replaced. 3. Installation Planning: Develop a comprehensive installation plan, including the positioning and configuration of ionization devices. Coordinate with the client to minimize disruption to building occupants during installation. 4. Installation Process: Mount ionization devices at designated locations within the HVAC system, ensuring secure placement. Connect ionization devices to the power supply and HVAC control system, ensuring proper wiring and grounding. Test the ionization equipment to ensure it is functioning correctly and efficiently. 5. Safety Measures: Implement safety features such as shutoff switches and alarms to monitor ionization levels and prevent over-ionization. Ensure that the installation complies with all safety standards and guidelines. 6. Airflow Optimization: Optimize the positioning and configuration of ionization devices to ensure even distribution of ions throughout the HVAC system. Verify that the ionization technology does not impede airflow or create turbulence. 7. Performance Testing: Conduct performance tests to measure the effectiveness of ionization in reducing airborne contaminants. Fine-tune the ionization system settings as needed to achieve desired air quality goals. Provide documentation of performance metrics and system operation. 8. Training and Documentation: Train building maintenance personnel on the operation, maintenance, and troubleshooting of the ionization system. Provide comprehensive documentation, including operation manuals, maintenance schedules, and safety guidelines. 9. Post-Installation Maintenance: Establish a maintenance schedule for routine inspections, cleaning, and replacement of ionization components as needed. Offer ongoing support and troubleshooting services for the ionization system. 10. Compliance and Certification: Ensure that the Ionization installation complies with relevant industry standards and regulations.

Post-Bid

Educational

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
40
Bidding Soon
418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2023

October 27, 2023

Project location map

101 S Haley St, Hazlehurst, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.