BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Fraser, Michigan. Working plans call for site work for a municipal facility.

**As of October 31, 2023 project was postponed. The requested scope of services includes: 1. Mobilize to job site and set up barricades around the designated work areas. 2. Demolish and remove the existing gas pumps, fuel island, concrete and tank sumps. 3. Prepare the area and install canopy footings, new island and tank sumps. 4. Construct and install a new canopy to include the new LED canopy fixtures. The dimensions of the canopy will be up to the discretion of the contractor but must at least large enough to cover the vehicles stationed at the fuel pumps. (or must be approved by Engineer) 5. Supply and install two (2) new tank sumps with all necessary fittings and entry boots. 6. Install new product piping from existing tanks to new fuel sumps. 7. Install new vent lines. 8. Supply and install two (2) new OPW (or equal) spill buckets, two (2) new48inchmanhole,one (1) 18 inch monitoring well cover. 9. Pour and finish 8 inch concrete, (estimated area is 975 square feet). 10. Install two (2) new OPW Global Select (or equal) suction pumps on new fueling island. Reference Number 0000330669 The City of Fraser, Michigan is requesting proposals from qualified firms for professional and technical services to remove and install new pumps, fuel system and canopy at the DPW yard. Delivery Point City Municipal Office 33000 Garfield Fraser MI 48026 Question Acceptance Deadline 09/29/2023 04:00 PM EDT Questions are submitted online No -- Questions about the RFP must be submitted in writing via online . -Award of Contract: October 12, 2023 -Effective Start Date: November 1, 2023 *The City reserves the right to waive any informality in any proposal, to reject any or all proposals in whole or in part, with or without cause, and/or to accept the proposal that in its sole judgment is in the best interests of the City.

Final Planning

Municipal

$55,500.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
190
Bidding Soon
2,660
All Active Projects
1,063
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 4, 2023

April 1, 2024

img_map_placeholder

31250 Kendall, Fraser, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.