Site work and asbestos abatement for an educational facility in Dearborn, Michigan. Completed plans call for site work for a 18,476-square-foot educational facility; and for asbestos abatement for a educational facility.

Reference Number 0000330822 Questions regarding bids can be emailed to Mr. Mark Andrews, Dearborn Public Schools. Asbestos Abatement at Haigh Elementary School Asbestos abatement work will be performed at Haigh Elementary School located at 601 Silvery Lane, Dearborn, Michigan 48128, The project consists of the ceilings demolition and removal of asbestos containing Glue Pods under 12"xl2" Ceiling tiles located throughout the school building ceiling (hallways, classrooms, and cafeteria) located on the main floor ofHaigh elementary school. In addition a removal of 400 linear feet ofpipe insulation throughout the school tunnel, boiler restroom and fan room. The school ceilings areas to be removed are approximately 18,476 square feet. The abatement operations dates and areas to be removed are listed below and as provided in the attached drawing; Location Start Date Finish Date Cafeteria Hallway North & West Hallway 12/22/2023 01/03/2024 Classrooms Ceilings 06/08/2024 06/13/2024 (27, 29,31,33,34,35,36) Cafeteria Ceiling & 06/14/2024 06/20/2024 Classrooms Ceilings Cafeteria Ceiling Hallway Ceiling 10/27/23 10/28/23 Remove 2' along exterior wall Remove 2' along interior hallway wall (26, 28, 30, 32) Miscellaneous Spot Remove (400) linear feet of pipe insulation in tunnel and complete removal in the school boiler restroom and fan room. The contractor must follow procedures for removal operations stated in Section L of this specification, part 5 through 9. The removal operations will be performed inside a Mini while Full enclosure procedures for cafeteria & west, north hallways and under continuous negative air. The abatement contractor must construct a decontamination facility attached to the enclosure which will house the clean room, shower room and dirty room. The asbestos abatement operations will be considered complete when visual inspection is passed and the test results for the final air clearance samples (PCM) indicated an airborne fiber concentration value of less than < 0.01 (f/cc) Fibers per Cubic Centimeter as recommended by the EPA. With the exceptions of Cafeteria hallway, north & west hallways, a TEM final air clearance will be conducted. The Owner will pay for the initial Transmission Electron Microscopy (TEM) final air clearance costs. However, if the regulated area does not pass the first clearance attempt, the abatement contractor will pay all remaining air monitoring and clearance costs including but not limited to testing time, laboratory analysis (TEM), shipping & handling and project related expenses, until the project is cleared per EPA regulations.

Award

Educational

$173,850.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
201
Bidding Soon
2,795
All Active Projects
1,119
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 5, 2023

October 27, 2023

June 20, 2024

img_map_placeholder

601 Silvery Ln, Dearborn, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.