Site work and paving for a transportation facility in Aurora, Oregon. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Substantial Completion: 15 Calendar Days After Odav's Issuance of Notice to Proceed Question Deadline 10/06/2023 Deadline for questions or requests for clarification 5 calendar days prior to the Bid Opening Date identified in OregonBuys for this ITB Deadline for requests for change, protests, and requests for approved equal brands (if applicable) 7 calendar days prior to the Bid Opening Date identified for this ITB Deadline for questions or requests for clarification 5 calendar days prior to the Bid Opening Date identified for this ITB Posting of Intent to Award Within 5 Business Days after the Bid Opening Date identified for this ITB Deadline for Award protest 5 calendar days after issuance of the notice of intent to award. See ITB Section C.3.14 ODOT, on behalf of ODAV, is seeking one qualified contractor to perform pavement rehabilitation at the Aurora State Airport. 40-01 Intent of contract. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 Alteration of work and quantities. The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owner's Engineer or RPR shall be and is hereby authorized to make, in writing, such in-scope alterations in the work and variation of quantities as may be necessary to complete the work, provided such action does not represent a significant change in the character of the work. For purpose of this section, a significant change in character of work means: any change that is outside the current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%. Work alterations and quantity variances that do not meet the definition of significant change in character of work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered Quantities. Should the value of altered work or quantity variance meet the criteria for significant change in character of work, such altered work and quantity variance shall be covered by a supplemental agreement. Supplemental agreements shall also require consent of the Contractor's surety and separate performance and payment bonds. If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion. 40-03 Omitted items. The Owner, the Owner's Engineer or the RPR may provide written notice to the Contractor to omit from the work any contract item that does not meet the definition of major contract item. Major contract items may be omitted by a supplemental agreement. Such omission of contract items shall not invalidate any other contract provision or requirement. Should a contract item be omitted or otherwise ordered to be non-performed, the Contractor shall be paid for all work performed toward completion of such item prior to the date of the order to omit such item. Payment for work performed shall be in accordance with Section 90, paragraph 90-04, Payment for Omitted Items. 40-04 Extra work. Should acceptable completion of the contract require the Contractor to perform an item of work not provided for in the awarded contract as previously modified by change order or supplemental agreement, Owner may issue a Change Order to cover the necessary extra work. Change orders for extra work shall contain agreed unit prices for performing the change order work in accordance with the requirements specified in the order, and shall contain any adjustment to the contract time that, in the RPR's opinion, is necessary for completion of the extra work.
Award
Transportation Terminals
$649,729.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 12, 2023
November 13, 2023
22801 Airport Rd NE, Aurora, OR
Related To This Project
Aurora, OR
Bid Date: Oct 26 2023
Aurora, OR
Bid Date: Nov 07 2023
Aurora, OR
Bid Date: Nov 07 2023
Aurora, OR
Bid Date: Dec 20 2023
Aurora, OR
Bid Date: Mar 26 2024
Aurora, OR
Bid Date: May 08 2024
Aurora, OR
Bid Date: Nov 19 2024
Aurora, OR
Bid Date: Nov 26 2024
Aurora, OR
Bid Date: Jun 15 2023
Aurora, OR
Bid Date: Jun 15 2023
Aurora, OR
Bid Date: Jun 01 2023
Aurora, OR
Bid Date: Oct 15 2020
Aurora, OR
Bid Date: Oct 31 2023
Aurora, OR
Bid Date: Sep 20 2022
Aurora, OR
Bid Date: Nov 21 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.