BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2023 at 7:00 PM

Updated January 27, 2024

Site work for a road / highway in Abbotsford, British Columbia. Completed plans call for site work for a road / highway.

Replacement of the Induced Current Cathodic Protection System at Lane Creek, on Dike Road in Mission, BC, which is a key component of the Abbotsford-Mission Joint Water Supply. The scope of work generally includes, but is not limited to, the following: Installation of a new anode bed Installation of new conduit, junction boxes, and wiring Installation of new rectifier Welding connection of wiring to water and sewer mains Documents can be obtained from https://abbotsford.bidsandtenders.ca/ Awarded value not released for publication.

Award

Roads / Highways

$250,000.00

Public - City

Site Work

23

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
69
Bidding Soon
2,262
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2023

November 20, 2023

Project location map

Multiple Locations, Abbotsford, BC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.