BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Greenwood, Minnesota. Completed plans call for site work for a water / sewer project.

Lift Station #3 Forcemain Replacement Project Please contact Adam Pawelk with HTPO at 952-829-0700 or apawelk@htpo.com with any questions. Site Directions: Lift station #3 is located off the north side of Hwy 7 approximately 550 feet west of Minnewashta Parkway. The force main will extend due north through backyard easements at the project terminus of 62nd Street W, near the NWC of Cathcart Park. Est. Completion Date: Dec. 29, 2023 In general the work consists of the following approximate quantities: 1080 lf 8" hdpe sdr 11.0 forcemain (directional bore) 1 each 60" sanitary mh - precast concrete 1 each 60" sanitary mh - polymer concrete or fiberglass. See project manual for additional details. The work to be done under this Contract includes, but is not necessarily limited to, furnishing all labor, materials, transportation, tools, supplies, equipment, etc. necessary for the following items: A. Installation of a directionally drilled HDPE forcemain pipe at Lift Station #3. B. Erosion and sediment control The Engineer when construction staking is needed. Includes a one-time staking of the following anticipated items: o Construction limits within the two 60' radius survey limits. o Line and grade stakes for two sanitary manholes. o Sanitary connection at the south lift station. C. Traffic control D. Site restoration The work under this Contract includes all of the work items as described in these Specifications and/or as shown on the Plans as prepared by HANSEN THORP PELLINEN OLSON, INC. Refer to the City of Chanhassen's Standard Specifications and Detail Plates for additional information. The Contractor shall coordinate site access and staging areas with City and Engineer to minimize disturbance. The Contractor shall confine work to available right-of-way and designated construction limits. In areas of limited construction easements, Contractor shall utilize special procedures and equipment to ensure confinement to available easements while not jeopardizing the safety of individuals or private property. The Contractor shall not enter for material delivery or occupy for any other purpose with persons, tools, equipment, construction materials, or with materials excavated from the trench, any private property outside the designed construction boundaries. If it is necessary or desirable that the Contractor use land outside of City right-of-way or easements, the Contractor shall obtain consent from and shall execute a written agreement with, the owner and tenant of the land. Any restoration necessary on private property outside of the temporary construction easements will be at the expense of the Contractor with no compensation from the City

Award

Water / Sewer

$238,555.00

Public - City

Site Work

7

20

6

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
68
Bidding Soon
1,629
All Active Projects
567
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 12, 2023

November 13, 2023

June 28, 2024

img_map_placeholder

MN-7 & Minnewashta Pkwy, Greenwood, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.