BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Oak Park, Illinois. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Madison Street Improvements Est. Completion Date: Nov. 5, 2024 Pre-Qualification: Yes In general, this contract includes removal of roadway, curb/gutter, sidewalk, brick pavers, driveway, lighting, and landscaping/ trees. Other elements include milling and resurfacing of HMA pavement, new brick pavement, new HMA pavement, water main removal/replacement, new water main, new lighting, landscape restoration, planting trees, curb/gutter, sidewalks, driveways, pavement marking, signage, drainage/utility lid adjustments, traffic loops/handhole modifications, maintenance of traffic, and all incidental and collateral work necessary to complete the project as shown on the plans and special provisions. The Village of Oak Park reserves the right to issue plans and specifications only to those contractors deemed qualified. All prospective bidders must prove they are pre-qualified by the Illinois Department of Transportation by uploading a certificate of eligibility when submitting their bid. This project is financed with local Village funds and Illinois Department of Commerce and Economic Opportunity (DCEO) grant funds. The work to be performed pursuant to this Proposal is subject to all state rules, regulations and guidelines including the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq., and Equal Opportunity requirements. Contractor will be required to comply with the Business Enterprise Program (BEP) for Minorities, Females, and Persons with Disabilities Act (30 ILCS 575/0.01 et seq.). This project will have a BEP utilization goal set by DCEO for a percentage of the grant dollars going to businesses that have been certified as owned and controlled by persons who are minority, female or who have disabilities. Contractors are required to reach the utilization goals or show good faith efforts to reach the utilization goals. See project manual for details. Non-compliance with the BEP goal and requirements will disqualify the bid.

Award

Roads / Highways

$7,124,630.00

Public - City

Outdoor Lighting, Paving, Site Work

109

9

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
89
Bidding Soon
1,796
All Active Projects
784
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 12, 2023

December 11, 2023

img_map_placeholder

Madison St, Oak Park, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.