Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2023 at 7:00 PM
Updated January 3, 2025
Renovation of a municipal facility in El Segundo, California. Completed plans call for the renovation of a municipal facility.
**As of November 09, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** In general, the Phase 1 HVAC Improvements will consist of demolition and installation of two rooftop HVAC units. The units that are to be replaced consists of a 7.5-Ton package unit, A 40-Ton Multizone unit comprised of a rooftop AHU. Replacement of associated exterior HVAC duct, duct supports, external refrigerant piping, controls, valves, service connections, electrical wiring, hangers and supports, duct insulation, vibration and seismic controls, like-for-like wiring, breakers, circuit disconnects and testing and commissioning. Work on the Project must be performed in strict conformity with Specifications No. PW 23- 03: Phase 1 City Hall HVAC Improvements Project which is filed with the Public Works Department. Contractors bidding the project shall provide a minimum of five government agency references, preferably municipal, for building similar projects (in terms of scope, size, type, magnitude and complexity) as the prime contractor in the past five (5) years. Bidders shall include references, etc. to demonstrate qualifications. Question Deadline 10/16/2023 at 4:00 PM PT Questions regarding the bid shall be submitted Electronically General Scope of Work: The scope of work consists of the demolition and installation of two Rooftop HVAC units. The units that are to be replaced consist of a 7.5-Ton package unit, a 40-Ton Multizone unit comprised of a rooftop AHU. The associated work consists of the following items: replacement of associated exterior HVAC duct, duct supports, external refrigerant piping, controls, valves, service connections, electrical wiring, hangers and supports, duct insulation, vibration and seismic controls, like-for-like wiring, breakers, circuit disconnects as well as Testing and commissioning. 1-2. Location of the Work: The project will occur at City Hall, 350 Main Street, El Segundo, CA 90245 1-3. Working Days and Time for Completion: Contractor will commence work on date specified in the Notice to Proceed to be issued to the Contractor by City of El Segundo Public Works Department and shall complete work within Thirty (30) working days after the date of commencement.
Bid Results
Municipal
$647,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
