BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a municipal facility in El Segundo, California. Completed plans call for the renovation of a municipal facility.

**As of November 09, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** In general, the Phase 1 HVAC Improvements will consist of demolition and installation of two rooftop HVAC units. The units that are to be replaced consists of a 7.5-Ton package unit, A 40-Ton Multizone unit comprised of a rooftop AHU. Replacement of associated exterior HVAC duct, duct supports, external refrigerant piping, controls, valves, service connections, electrical wiring, hangers and supports, duct insulation, vibration and seismic controls, like-for-like wiring, breakers, circuit disconnects and testing and commissioning. Work on the Project must be performed in strict conformity with Specifications No. PW 23- 03: Phase 1 City Hall HVAC Improvements Project which is filed with the Public Works Department. Contractors bidding the project shall provide a minimum of five government agency references, preferably municipal, for building similar projects (in terms of scope, size, type, magnitude and complexity) as the prime contractor in the past five (5) years. Bidders shall include references, etc. to demonstrate qualifications. Question Deadline 10/16/2023 at 4:00 PM PT Questions regarding the bid shall be submitted Electronically General Scope of Work: The scope of work consists of the demolition and installation of two Rooftop HVAC units. The units that are to be replaced consist of a 7.5-Ton package unit, a 40-Ton Multizone unit comprised of a rooftop AHU. The associated work consists of the following items: replacement of associated exterior HVAC duct, duct supports, external refrigerant piping, controls, valves, service connections, electrical wiring, hangers and supports, duct insulation, vibration and seismic controls, like-for-like wiring, breakers, circuit disconnects as well as Testing and commissioning. 1-2. Location of the Work: The project will occur at City Hall, 350 Main Street, El Segundo, CA 90245 1-3. Working Days and Time for Completion: Contractor will commence work on date specified in the Notice to Proceed to be issued to the Contractor by City of El Segundo Public Works Department and shall complete work within Thirty (30) working days after the date of commencement.

Bid Results

Municipal

$647,000.00

Public - City

Renovation

21

7

7

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
104
Bidding Soon
2,229
All Active Projects
985
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

November 30, 2023

img_map_placeholder

350 Main St, El Segundo, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.