BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2023 at 8:00 PM

Updated August 8, 2025

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Bell ES - 3rd Floor Carpet Replacement. Only Prequalified Pool Various Trades PLA for work over 25K Questions Due Date: Sep 20th 2023, 10:00 AM CDT Supply and Install carpet tile for 3rd floor corridor install commercial carpet tiles. 1) Remove current carpeting in 3rd floor corridor and new commercial carpet tiles. 2) Remove and provide new oak quarter round stained and varnished to match existing baseboard for the 3rd floor corridor, total sq. yd 1513 to be verified by vendor. 3) Staff to remove all furniture and items from the 3rd floor corridor. 4) Apply diamabrush to floors.

Bid Results

Educational

$47,989.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
490
Active Projects
273
Bidding Soon
3,513
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2023

November 24, 2023

Project location map

3730 N Oakley Ave, Chicago, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.