Site work, new construction and renovation of a warehouse / distribution facility in Breckenridge, Texas. Completed plans call for the construction of a warehouse / distribution facility; for the renovation of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

The Project includes the following Work: Metal building construction and renovation to include a new 50x150x16 welded metal lean to shed, a 50x40x14 welded metal shop on existing concrete slab, and a 50x40x14 welded metal shop on new concrete slab, including all labor, equipment, materials, electrical and associated appurtenances. Proposal Documents may be downloaded from the designated website. Proposers are urged to register with the designated website as a plan holder. The designated website will be updated periodically with addenda, reports, and other information relevant to submitting a sealed Proposal for the Project. All official notifications, addenda, and other Proposal Documents will be offered only through the designated website. Question Deadline 09/29/2023 at 5:00 PM CT The City Manager contact information is: Cynthia Northrop cnorthrop@breckenridgetx.gov 254-246-1963 105 North Rose Avenue, Breckenridge, TX 76424 The selected Respondent to this Request for Proposals (RFP) shall be responsible for material, labor and all associated costs for the following metal building construction improvements: A) Material, labor and all associated costs for completion of a 50'x150'x16' metal weld up lean-to shed with a native soil floor. The building shall have 30' bays and all iron is to be primed. Metal sheeting is to be 26 gauge "R" panel with 30-yearmanufacturer warranty against fading. The structure is to be fully trimmed with gutters and downspouts. At minimum, the concrete foundation piers shall be 18" diameter and 36" deep with rebar cage and 3,500 psi concrete. The electrical work will include all necessary upgrades and/or improvements (wiring, conduit, breakers, panels, etc.) necessary to provide: a. A minimum of six (6) 110V receptacles located on each end of the structure and one in the middle. b. A minimum of four (4) LED flood/security lights. B) Material, labor and all associated costs for completion of a 50'x40'x14' weld up metal shop on an existing concrete slab. Metal building to include one (1) roll up 14'x14' door and one (1) 3'x7' door. Each roll up door shall include a 10-foot concrete approach ramp that is a minimum of 3,500 psi compressive strength, 7-inches thick, reinforced with #4 steel bars at 18-inch on center each way (O.C.E.W), and four (4) feet wider than the roll up door. Metal sheeting is to be 26 gauge "R" panel with 30-year manufacturer warranty against fading. The structure is to be fully trimmed with gutters and downspouts. The electrical work will include all necessary upgrades and/or improvements (wiring, conduit, breakers, panels, etc.) necessary to provide: a. A minimum of eight (8) 110V receptacles and located so that two (2) are on each wall. b. A minimum of four (4) LED flood/security lights. C) Material, labor and all associated costs for completion of a 50'x40'x14' weld up metal shop on a new concrete slab. The concrete slab shall be a minimum of 3,500 psi compressive strength, 7-inches thick, and reinforced with #4 steel bars at 18-inch on center each way (O.C.E.W). Metal building to include one (1) roll up 14'x14' door and one (1) 3'x7' door. Each roll up door shall include a 10-foot concrete approach ramp that is a minimum of 3,500 psi compressive strength, 7-inches thick, reinforced with #4 steel bars at 18-inch on center each way (O.C.E.W), and four (4) feet wider than the roll up door. Metal sheeting is to be 26 gauge "R" panel with 30-year manufacturer warranty against fading. The structure is to be fully trimmed with gutters and downspouts. The electrical work will include all necessary upgrades and/or improvements (wiring, conduit, breakers, panels, etc.) necessary to provide: a. A minimum of eight (8) 110V receptacles and located so that two (2) are on each wall. b. A minimum of four (4) LED flood/security lights. c. A 220V receptacle for welding machine. Location to be determined by City

Award

Warehouse / Distribution

$700,000.00

Public - City

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
3
Bidding Soon
185
All Active Projects
71
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2023

November 6, 2023

img_map_placeholder

To Be Determined, Breckenridge, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.