BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Hines, Illinois. Completed plans call for the renovation of a medical facility.

Exhaust Fan Replacement and Installation Services. In order to maintain integrity of this solicitation and subsequent award date, all offerors are advised that any question and answer requests must be submitted in a written form via e-mail to the Contracting Officer JERRI.SCHUSTER@va.gov no later than FRIDAY SEPTEMBER 22, AT 10:00AM LOCAL TIME. Contracting will issue a consolidated response via solicitation amendment to https://sam.gov Contract Opportunities within 2 business days to all parties Exhaust Fan Replacement and Installation Services for the Edward Hines Jr. VA Hospital located in Hines,IL. Pricing will be inclusive, including travel. Please see Statement of Work (SOW) for details. Location of Service The Contractor shall provide all labor, material, tools, travel, management, and equipment necessary for the repair of items described in this document at the Edward Hines Jr. VA Hospital (HINES VAH), 5000 South 5th Avenue, Hines, Illinois 60141. 2. Period of Performance The period of performance shall not exceed one hundred eighty (180) days after contract award. This period reflects the entire contract period to include preconstruction periods, administrative time, and contract close out. Actual onsite construction time is not expected to exceed (120) days from initial mobilization. A detailed schedule must be provided to the COR within 30 days after receiving the contract notice to proceed and prior to any onsite work. 3. Background/History/Current Conditions Hines VA is an active medical campus. The contractor must not interfere with patient care or VA staff unless given permission in writing from the COR/CO. Currently, Penthouse B has an Exhaust fan the discharges into the penthouse instead of the outside. This means that contaminated air is discharging into the space. 4. Objective Complete the re-route of the ductwork outside of the building with a new in-line exhaust fan. 5. Scope of Work This contract includes the following: _ Contractor will provide and install a new .25hp (Minimum) in-line fan providing a minimum of 350cfm and all necessary duct work to discharge the new exhaust out of SICU. Contractor can utilize the structure above to hand the new fan unit. _ Contractor to remove existing .25 hp exhaust fan from its current location in penthouse B and utilize the current curbing. _ Contractor will extend the new ductwork vertically 10' from the floor, install a 90_ fitting and run new duct to the exterior of the building. _ Contractor will cut wall to allow duct work to penetrate the building, Provide and install all necessary flashing, and make the exterior duct work go up 2' and 90_ so water cannot run down the duct. The end of the duct will have screening to prevent vermin from entering and nesting (This needs to be removable for cleaning). All supports for the ductwork on the exterior that is tied to the building will be sealed to prevent water intrusion. _ Contractor will test the areas the exhaust fan is serving and verify the required CFM of each exhaust vent. If minimum CFM is not reached, the contractor will make modifications until the required CFM is reached.

Post-Bid

Medical

$100,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
119
Bidding Soon
1,774
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.