BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a water / sewer project in Upton, New York. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

REVISED Solicitation Overview Meeting (virtual) - 3/19/24 (originally 3/18/24) Brookhaven National Laboratory (BNL) currently maintains two operable elevated storage tanks (water towers) on site. A large 1-million-gallon structure (not in this scope) on the northeast side of the site that was constructed in the 1980's, and a 300,000-gallon structure on the southwest side of the site that is original to Camp Upton, constructed in the 1940's. The 300,000-gallon elevated storage tank has been in service for 80+ years and has outlasted its intended lifetime use. A new 500,000 gallon water tower is near completion and will be commissioned in the short future to meet campus demand to replace the existing 300,000-gallon elevated storage tank. Following the commissioning and operational transition of the new water tower, the 1940's vintage water tower will be slated to be demolished. This solicitation is for the demolition and decommissioning of the 1940's 300,000-gallon elevated water storage tank structure. The 1940's vintage structure is comprised of riveted structural steel standing roughly 160 feet tall with approximate diameter of 50 feet. The existing paint coating system(s) were confirmed via analytical sampling to be lead based paint with elevated levels of Barium and other heavy metals. All work shall conform to applicable federal, state, and local code requirements. The scope of work shall be performed in accordance with the Soliciation and enclosures (link provided). Key dates: Solicitation Overview Meeting RSVP - 3/17/24 Solicitation Overview Meeting (virtual) - 3/18/24 Manadatory Site Visit Registration Deadline - 3/22/24 Mandatory Site Visit - 3/25/24 Questions Deadline - 3/29/24 Offers Deadline - 4/12/24 Award Month (estimated) - June 2024

Post-Bid

Water / Sewer

$250,000.00

Public - Federal

Demolition, Site Work

12

35

5

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
407
Active Projects
202
Bidding Soon
3,886
All Active Projects
1,770
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2024

May 13, 2024

img_map_placeholder

98 Rochester St, Upton, NY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.