Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition and site work for a water / sewer project in Upton, New York. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.
REVISED Solicitation Overview Meeting (virtual) - 3/19/24 (originally 3/18/24) Brookhaven National Laboratory (BNL) currently maintains two operable elevated storage tanks (water towers) on site. A large 1-million-gallon structure (not in this scope) on the northeast side of the site that was constructed in the 1980's, and a 300,000-gallon structure on the southwest side of the site that is original to Camp Upton, constructed in the 1940's. The 300,000-gallon elevated storage tank has been in service for 80+ years and has outlasted its intended lifetime use. A new 500,000 gallon water tower is near completion and will be commissioned in the short future to meet campus demand to replace the existing 300,000-gallon elevated storage tank. Following the commissioning and operational transition of the new water tower, the 1940's vintage water tower will be slated to be demolished. This solicitation is for the demolition and decommissioning of the 1940's 300,000-gallon elevated water storage tank structure. The 1940's vintage structure is comprised of riveted structural steel standing roughly 160 feet tall with approximate diameter of 50 feet. The existing paint coating system(s) were confirmed via analytical sampling to be lead based paint with elevated levels of Barium and other heavy metals. All work shall conform to applicable federal, state, and local code requirements. The scope of work shall be performed in accordance with the Soliciation and enclosures (link provided). Key dates: Solicitation Overview Meeting RSVP - 3/17/24 Solicitation Overview Meeting (virtual) - 3/18/24 Manadatory Site Visit Registration Deadline - 3/22/24 Mandatory Site Visit - 3/25/24 Questions Deadline - 3/29/24 Offers Deadline - 4/12/24 Award Month (estimated) - June 2024
Post-Bid
Water / Sewer
$250,000.00
Public - Federal
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 12, 2024
May 13, 2024
98 Rochester St, Upton, NY
Related To This Project
Upton, NY
Bid Date: Oct 25 2023
Upton, NY
Bid Date: Nov 15 2023
Upton, NY
Bid Date: Nov 13 2023
Upton, NY
Bid Date: Nov 08 2023
Upton, NY
Bid Date: Nov 13 2023
Upton, NY
Bid Date: Nov 13 2023
Upton, NY
Bid Date: Jan 02 2024
Upton, NY
Bid Date: Dec 26 2023
Upton, NY
Bid Date: Mar 17 2022
Upton, NY
--
Upton, NY
Bid Date: Oct 17 2023
Upton, NY
Bid Date: Sep 22 2023
Upton, NY
Bid Date: Sep 14 2023
Upton, NY
Bid Date: Aug 23 2023
Upton, NY
Bid Date: Aug 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.