Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Deltona, Florida. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Construction of the FORT SMITH PUMP STATION MODIFICATIONS. The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following: Conversion of an existing above-grade, single, suction-lift pump station to a submersible, duplex pump station. Improvements include a duplex submersible pump station with a screening device on the intake, regrading of the pond near the intake, the addition of water service from the nearest water main, a generator and conversion of overhead to underground power feed from Fort Smith Boulevard. All questions are to be directed, IN WRITING, to Mary E. Perez at meperez@deltonafl.gov or faxed to (386) 878- 8571 seven calendar days prior to due date in order to issue an addendum. The deadline for questions for this bid is October 17, 2023. The City of Deltona reserves the right to accept or reject any or all bids/proposals and to make the award to that Bidder/Respondent, who in the opinion of the City will be in the best interest of and/or the most advantageous to the City. The City of Deltona also reserves the right to reject the bid/proposal of any vendor who has previously failed in the proper performance of an award or to deliver on time contracts of a similar nature or who, in the City's opinion, is not in a position to perform properly under this award. The City of Deltona reserves the right to inspect all facilities of bidders/respondents in order to make a determination as to the foregoing. The City of Deltona reserves the right to waive any irregularities, informalities, and technicalities in offers received, and may, at its discretion, request a re-bid, or abandon the project/procurement in its entirety. PRE-BID CONFERENCE: There will not be a pre-bid conference associated with the Ft. Smith Pump Station Modifications project DESCRIPTION OF WORK: All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by Mead & Hunt and the proposed improvements will be awarded and constructed, if award is made, under one Contract. Bids shall be submitted for furnishing, delivering and installing all materials, equipment and services, including labor, for the Work, which generally involves: -Demolition and replacement of the existing stormwater pump station and intake pipe (including electrical, yard piping, mechanical, and associated components) - Regrading of the stormwater pond - Demolition and replacement of the entrance gate and sidewalk/entrance driveway - Site utility connections (Install water main connection to existing water main) - Site restoration work including re-sodding of areas disturbed by construction Engineers Estimate for this project is $434,600.00. A Bid Bond is required for this solicitation. Bid Security will be submitted and shall be made payable to City, in an amount of not less than five percent (5%) of the Bidder's Contract Price and in the form of a certified or cashier's check A Payment and Performance bond is required for this project. A payment and performance bond for 100% of the contract price will be required from the Contractor for this project. The deadline for questions for this bid is October 17, 2023. All questions are to be directed, IN WRITING, to Mary E. Perez at meperez@deltonafl.gov or faxed to (386) 878 8571 Contract time is 180 days to substantial completion, with an additional 30 days to final completion. Total contract time for this project is 210 days. 1. The Contractor shall furnish all labor, superintendence, materials, plant power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion of the Work. The Contractor shall obtain and pay for all necessary local building permits. The Contractor shall perform and complete the work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer, and in strict accordance with the Contract Documents. The Contractor shall clean up the Work and maintain it during and after construction, until accepted, and shall do all Work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the Work. 2. The cost of incidental work described in these Project Requirements, for which there are no specific Contract Items, shall be considered as part of the general cost of doing the Work and shall be included in the prices for the various Contract Items. No additional payment will be made therefore. 3. The Contractor shall provide and maintain such modern plant, tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the Work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials, and equipment, prior approval of the Engineer notwithstanding.
Award
Water / Sewer
$669,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 21, 2023
November 23, 2023
Multiple Locations, Deltona, FL
Related To This Project
Deltona, FL
Bid Date: Feb 01 2024
Deltona, FL
--
Deltona, FL
--
Deltona, FL
--
Deltona, FL
--
Deltona, FL
Bid Date: Nov 10 2023
Deltona, FL
--
Deltona, FL
Bid Date: Jan 11 2024
Deltona, FL
Bid Date: Nov 18 2021
Deltona, FL
--
Deltona, FL
Bid Date: Aug 30 2022
Deltona, FL
Bid Date: Jul 06 2022
Deltona, FL
Bid Date: Mar 23 2022
Deltona, FL
--
Deltona, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.