BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, renovation and addition to an educational facility in Ellington, Connecticut. Completed plans call for the addition of a 40,000-square-foot, two-story above grade educational facility; for site work for a educational facility; for the demolition of a 54,000-square-foot educational facility; and for the renovation of a 54,000-square-foot, two-story above grade educational facility.

The Windermere Elementary School Project is a multi-phased, multi-shift project that includes a new 2-story 40,000SF academic wing, 54,000SF of renovate-as-new to areas of the school and 54,000SF of building demolition. Groundbreaking for the new academic wing is to occur early November 2023 and is scheduled for occupancy in January of 2025. Renovations to (2) single-story academic wings will start concurrently in January 2025 and are scheduled for occupancy in September 2025. The school will remain open during 2023-2024 & 2024-2025 academic years and provisions will be made to accommodate the students and staff around and/or through the work areas. Multiple shifts are expected to meet the renovation schedules. Shift work will be permitted for interior work only. The existing areas to be renovated were built in 1966 and 1993; existing areas to be demolished were built in 1966 and 2001. Hazardous Materials are known to be present in the original 1966 building and 1993 Addition. Completion of all renovations and building demolition is scheduled for December 2025 with limited site improvements scheduled for Spring 2026. Please see Specification Sections Nos. 00 24 13 Bid Packages and 01 50 00.1 Construction Controls and Temporary Facilities for additional Phasing, Logistical and Schedule requirements. For questions regarding Addenda, or to confirm the bid date, contact: Julia Hall at O&G Industries, Inc. (860) 496-4223 or email juliahall@ogind.com. Technical questions, specific questions regarding bidding procedures, project scope and site visits may be directed to Mike Skapczynski at O&G Industries, Inc. (860) 496-4226. No oral, telephone or electronic proposals will be considered. All bids shall stand available for acceptance for a period of ninety (90) days from the date proposals are received. The Owner or its Designee reserves the right to reject any or all bids. Bid Security, Payment and Performance Bonds will be required. Refer to paragraph 1 in the Instructions to Bidders for amount of Bid Security required for this project. Bid Result : 2.02 - ABATEMENT & DEMOLITION - Bestech, Inc. - $1,489,000 2.03 - CONCRETE - Marguerite Concrete, Inc. - $2,122,000 2.04 - MASONRY - Mid State Mason Contractors Inc. - $1,813,000 2.05m - MISCELLANEOUS METALS - General Welding & Fabrication - $460,000 2.05s - STRUCTURAL STEEL - Steeltech Building Products - $2,485,000 2.06 - MILLWORK - Pursuit Construction (AWI) - $2,875,000 2.07a - WATERPROOFING, AIR BARRIER & SEALANTS - Armani Restoration Inc. - $328,000 2.07f - FIRESTOPPING - New Haven Firestop Systems - $183,215 2.07r - ROOFING - Gold Seal Roofing & Sheetmetal - $2,656,000 2.07s - FIBER CEMENT SIDING - Ultimate Construction, LLC - $998,700 2.08 - ALUMINUM ENTRANCES, STOREFRONTS & CURTAINWALL - Accurate Door & Window, LLC - $2,569,800 2.09a - ACOUSTICAL - Acoustics, Inc. - $934,681 2.09d - DRYWALL - H. Carr & Sons, Inc. $4,448,000 2.09p - PAINTING - Professional Painting - $359,600 2.10 - GENERAL TRADES - Scope Construction Company, Inc. - $1,590,700 2.11 - FOOD SERVICE EQUIPMENT - Singer-Kittredge Equipment Inc. - $649,771 2.13 - PROJECT CLEANLINESS / FINAL CLEANING - Coastal Cleaning - $99,000 2.21 - FIRE PROTECTION - H.H.S. Mechanical Contractors, Inc. - $408,000 2.22 - PLUMBING - P&D Mechanical, Inc. - $2,452,688 2.23 - HVAC - Ferguson Mechanical Co., Inc. - $7,692,000 2.26 - ELECTRICAL - J.E. Shea Electric, Inc. - $3,775,000 2.26fa - FIRE DETECTION & ALARM - J.E. Shea Electric, Inc. - $398,500 2.27 - TECHNOLOGY & SECURITY - System One, LLC - $1,417,030 2.31 - PHASE 2 SITEWORK - Gerber Construction - $7,721,000 2.09t - TILING - Barall & Konover Floors, Inc. - $645,000 2.09f - FLOORING - M. Frank Higgins & Co., Inc. - $1,500,000

Bid Results

Educational

$52,070,685.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

483

48

110

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
418
Active Projects
190
Bidding Soon
4,020
All Active Projects
1,729
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2023

June 3, 2024

img_map_placeholder

2 Abbott Rd, Ellington, CT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.