BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lansdale, Pennsylvania. Completed plans call for site work for a water / sewer project.

**As of December 13, 2023, this project has not yet been awarded. The project is expected to be awarded on December 20, 2023.** DESCRIPTION The Borough of Lansdale is replacing an existing outfall at Cherry Street, replacing stormwater piping and existing headwall, and performing swale improvements. The scope of work is more fully described in the Project Specifications herein and on the Project Plans. CLARIFICATION DEADLINE 10/10/2023 5:00 PM The Borough of Lansdale is replacing an existing outfall at Cherry Street, replacing stormwater piping and existing headwall, and performing swale improvements. The scope of work is more fully described in the Project Specifications herein and on the Project Plans. U1.03 Work Included A. Base Bid - Mobilization. 1. The assembly and set-up of the general plant required to comply with the contract and with local and state laws and regulations. This includes contractor's offices, shops, plants, storage areas, and sanitary or other facilities. This work includes obtaining the required permits, insurance, bonds, and any other initial items required for the start of the work. B. Base Bid - Maintenance and Protection of Traffic. 1. The Contractor shall erect or place and maintain in good condition, barricades, warning signs, lights, flares, approved yellow-flashing light units, rubber traffic cones, and other warning and dangersignals and devices, appropriate and adequate for the specific needs and subject to the Engineer's approval, at working sites, closed roads, intersections, open excavations, locations of material storage, standing equipment and other obstructions, at points where the usable vehicular or pedestrian traffic width of the road or sidewalk is reduced, at points where traffic is deflected from its normal courses or lanes, and at other places of danger to vehicular or pedestrian traffic. C. Base Bid - Site Clearing. 1. Perform site clearing necessary for the proposed improvements. 2. Remove Trees, as shown on Project Plans. Tree removal shall include stump removal to 12" below proposed grade or any proposed feature. Maintenance Bond 100% Item #20 has been modified to make it a fixed bid allowance item.

Bid Results

Water / Sewer

$92,195.00

Public - City

Site Work

10

18

17

6

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
439
Active Projects
216
Bidding Soon
4,036
All Active Projects
1,910
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

January 8, 2024

img_map_placeholder

Cherry St, Lansdale, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.