Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a mixed-use development in Graham, Washington. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
New Bethel High School SEPA Mitigated Determination of Non-Significance (MDNS) Notice of Availability and Comment Period Notice of Availability and Comment Period on the SEPA Mitigated Determination of Non-Significance (MDNS) for the construction of the 281,723 square foot replacement school for the Bethel High School located at 7718 224th Street East, Graham Washington, including: The proposal is to construct a 281,723 square foot high school, with associated access, parking, student drop-off and bus drop-off areas, and fields. The building will accommodate up to 1800 students and staff. The Project includes the potential future expansion for four classroom portables to accommodate 200 students and a portable for a potential future school health center. The site for the new school is on a 98-acre site located at 7718 224th Street East, Graham, Washington (Parcel Nos. 0418172021, 0418172019, 0418172010, and 0418172009). The main access for the New Bethel High School will be from 224th Street East at 77th Avenue East, a private drive access, for use of students, staff, and visitors. The bus access will be from 70 Avenue East, extending east into the school site. The Bethel School District No. 403 has determined that the proposal does not have probable significant adverse impact on the environment with mitigation proposed or incorporated into the project as noted in the MDNS. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed Expanded Environmental Checklist with Appendices submitted by the District, engineering reports, environmental studies and reports, plans, and other information on file with the District. This information is available to the public on request. The MDNS is issued under 197-11-340(2). If there are any questions regarding the New Bethel High School Project, please do not hesitate to contact Jeffrey Mann, Facilities Planner, Bethel School District at 253-800-6776 or by Email at jemann@bethelsd.org.
Post-Bid
Educational
$430,000.00
Public - County
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2023
November 8, 2023
7718 224th St E, Graham, WA
Related To This Project
Graham, WA
Bid Date: Jan 04 2024
Graham, WA
Bid Date: Apr 29 2019
Graham, WA
Bid Date: Mar 27 2024
Graham, WA
Bid Date: Apr 04 2024
Graham, WA
Bid Date: Apr 25 2024
Graham, WA
Bid Date: May 15 2024
Graham, WA
Bid Date: May 31 2024
Graham, WA
--
Graham, WA
Bid Date: Mar 07 2022
Graham, WA
Bid Date: Oct 01 2021
Graham, WA
Bid Date: Dec 29 2021
Graham, WA
Bid Date: Nov 17 2021
Graham, WA
Bid Date: May 25 2023
Graham, WA
Bid Date: May 15 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.