BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Berwick, Maine. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project includes the following Work: Upgrades to two Trident Model TR-210A filters including 16 underdrains, blowers, filter media, and all hardware and appurtenances necessary to complete the work. Refer to Appendix A. The replacement of one raw water pump and one finished water pump with new horizontal, end suction, centrifugal pumps furnished by the Owner and installed by the contractor. The replacement of one raw water pump and one finished water pump with new horizontal, end suction, centrifugal pumps to be furnished and installed by the Contractor. Substantial and Final Completion is 180 and 210 days, respectively. The lead time for the Wes Tech Equipment is 24-26 weeks upon executed of a purchase order between the Contractor and Wes tech. The actual days of work on-site is anticipated to be up to 60 days with up to 20 additional days for commissioning and punch list completion. Bonds: A certified check or bank draft payable to the OWNER or a satisfactory Bid Bond (guarantee) executed by the Bidder and a Surety Company in the equal to five percent (5%) of the maximum Bid price shall be submitted with each bid. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the owner. Performance and Payment Bonds are required for 100% of the contract price. Disadvantaged Business Enterprise Requirements: Each bidder shall take special notice of the Guidance for use of Disadvantaged Business Enterprises in sub-agreements in the DWSRF Supplemental General Conditions. Failure to complete the requirements of this program may result in finding that the bidder is non-responsive and therefore, not eligible to the award of this contract. Complete requirements are detailed in the Bid Documents. Non-discrimination in Employment and Labor Standards: Bidders on this work will be required to comply with the President's Executive Order No. 11246 and amendments and supplements to that Order. The requirements for Bidders and CONTRACTORS under this Order are located in the DWSRF Supplemental General Conditions. Federal Requirements: This project is subject to Davis-Bacon Wages and American Iron and Steel requirements Department of Labor Regulations: The Contractor must comply with the Department of Labor

Bid Results

Water / Sewer

$448,200.00

Public - City

Renovation, Site Work

11

12

10

7

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
101
Bidding Soon
1,874
All Active Projects
747
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

January 1, 2024

img_map_placeholder

150 Rochester St, Berwick, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.