Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Cave Creek, Arizona. Completed plans call for site work for a 179,480-square-foot road / highway; and for paving for a road / highway.
The Town of Cave Creek is proposing to combine multiple paving projects into one complete project. The projects consist of 5 roads requiring a complete mill and 2 1/2 -inch thick pavement installation as well as 2 roads requiring an edge mill and 2 1/2 -inch overlay. The complete mill and pave projects will consist of the complete mill and removal of the existing pavement in accordance with MAG Standard 317. Immediately following the milling of all existing pavement, the contractor will grade and compact the subgrade prior to placement of new asphalt. All new asphalt will be installed in accordance with MAG standard 321. The pavement installation would consist of 3/4 -inch asphalt in accordance with MAG Standard Specification 710. The combined areas to be completely milled and paved consist of portions of 48th St, N. Canyon Ridge Trail, Hidden Valley Dr, Skyline Drive, and 50th St. These areas of construction total approximately 121,500 square feet (13,S00SY). The combined areas to be edge milled and overlayed consist of portions of Highland Rd, and Rancho Manana Blvd. These areas of construction total approximately 57,980 square feet (6,442SY). The total combined area of these projects totals approximately 179,480 square feet (19,942SY). The successful bidder will be required to provide 100 percent performance and payment bonds in accordance with MAG Standard Specifications. The successful bidder will be required to provide insurances commensurate with those listed in the MAG Standard Specifications and name the Town as an additional insured as appropriate. The Town will retain a 10 percent of any payment made for completed work until such time as the project has been fully completed, equipment demobilized, and site cleared of any trash or debris associated with the construction. The project award is currently scheduled to go before Town Council for approval in November 2023, with the notice to proceed scheduled to be issued shortly thereafter. The completion of the project must be completed by June 30, 2024, to coincide with the closing of the Town of Cave Creek's fiscal year. Competitive proposals for the services specified in this notice will be received by the Town of Cave Creek at the above specified location until the time and date cited. Proposals must be in the actual possession of the Town of Cave Creek on or prior to the exact time and date indicated above. Late proposals will not be considered. The preparation of the RFP response will be at the expense of the respondent. The Town will not reimburse the respondent for any costs associated with the preparation or submission of any proposal. All RFP responses become the sole property of the Town of Cave Creek. All questions related to Deputy Public Works Director, at TThurman@CaveCreekAZ.Gov.
Award
Roads / Highways
$841,999.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 19, 2023
December 18, 2023
Multiple Locations, Cave Creek, AZ
Related To This Project
Cave Creek, AZ
Bid Date: Jan 25 2024
Cave Creek, AZ
--
Cave Creek, AZ
--
Cave Creek, AZ
--
Cave Creek, AZ
Bid Date: Feb 13 2024
Cave Creek, AZ
Bid Date: Jul 31 2020
Cave Creek, AZ
--
Cave Creek, AZ
--
Cave Creek, AZ
--
Cave Creek, AZ
--
Cave Creek, AZ
--
Cave Creek, AZ
Bid Date: Aug 22 2023
Cave Creek, AZ
Bid Date: Apr 27 2023
Cave Creek, AZ
Bid Date: May 22 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.