Site work and new construction of a fire / police facility in Fremont, California. Conceptual plans call for the construction of a fire / police facility; and for site work for a fire / police facility.
As Of 12/19/2023: This is notice of the City of Fremont's intent to reject all proposals for the above-referenced project. Priorities with the Police Department’s planned purchase of electric patrol vehicles have changed in the near-term creating an issue for the immediate need of a battery-boosted EV fast charging station. The City has determined that purchasing one of these charging stations at this point in time is not cost-effective towards the City’s overall vision for EV Infrastructure for the Police Campus and at other City-owned facilities. The primary purpose of this Request for Proposals ("Request") is to solicit proposals from qualified providers/developers ("Proposer or Proposers") of electric vehicle (EV) infrastructure for one (1) single-port or dual-port battery assisted EV fast charger at the Police Department Campus (2000 Stevenson Blvd) for the City of Fremont ("the City"). The City may choose to award this Project to two (2) separate Proposers. This approach enables the City to assess the performance and efficiency of charging station(s) from two different battery-boosted charger manufacturers and may inform future procurement decisions. The City may choose to expand this Project to include additional EV chargers at other City facility locations. The scope of this Proposal includes design and installation, procurement of materials, permitting, installation, interconnection, and all associated documentation, maintenance, and warranties. Proposer should propose one (1) single-port or dual-port EV charger station, along with necessary associated pedestal, hardware, and electrical infrastructure to enable a turn-key installation. City may either purchase outright the EV charging station(s) or consider other financing options, such as, for example, having the EV charging station(s) financed, owned, and operated by the manufacturer under a separate agreement (such as a Charging as a Service Agreement). To achieve the best value for the City, various financing options will be considered so that the City can select from appropriate choices including, but not limited to, direct purchase, charging as a service, and other cost-effective options recommended by the Proposer. The Project is intended to support four (4) primary goals: 1. Reduce the City's environmental impacts, including greenhouse gas emissions 2. Utilize Battery-Boosted EV charging capabilities at the Fremont Police Department Campus to reduce peak utility rate cost impacts of fast charging 3. Utilize the facility's limited existing switchboards to avoid the need for electric service expansion 4. Account for off-grid EV charging capabilities during a power outage or Public Safety Power Shutoff (PSPS) To achieve these goals, Proposers are expected to complete four (4) primary objectives: 1. Designing and permitting Battery-Boosted Electric Vehicle Fast Charging Infrastructure at Fremont Police Department Campus
Project Abandoned
Fire / Police
$954,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2023
March 1, 2024
2000 Stevenson Blvd, Fremont, CA
Related To This Project
Fremont, CA
--
Fremont, CA
Bid Date: Oct 18 2023
Fremont, CA
Bid Date: Nov 02 2023
Fremont, CA
--
Fremont, CA
Bid Date: Jun 22 2021
Fremont, CA
Bid Date: Nov 18 2020
Fremont, CA
Bid Date: Nov 20 2023
Fremont, CA
Bid Date: Oct 24 2023
Fremont, CA
--
Fremont, CA
--
Fremont, CA
--
Fremont, CA
Bid Date: Nov 16 2023
Fremont, CA
Bid Date: Jun 06 2019
Fremont, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.