EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Hawthorne, New Jersey. Completed plans call for site work for a playground / park / athletic field.

The work to be performed under this contract includes the installation of a new Musco Sports Lighting system and additional miscellaneous infrastructure. This contract does not include the furnishing of the Musco lighting materials; all Musco materials shall be procured directly by the Owner for installation only by the Contractor. Principal items of work in the project include: L.S. Installation and Labor for Musco Sports Lighting System . L.S. Labor, Material, and Equipment for Site Clearing The work contemplated under this Contract shall be completed by February 23, 2024. Printed copies of the plans, specification, and contract documents may be obtained upon request, in accordance with Boswell's applicable printing fees at the time of request. Each bid must be made upon the prescribed forms, furnished with the Contract Drawings and Specifications, including the non-collusion affidavit and ownership statement compliance form and must be accompanied by a Consent of Surety and a certified check, cashier's check, or Bid Bond of not less than ten (10%) percent of the amount bid and, not to exceed $20,000.00. Such checks and Bonds shall be made payable to the Owner and will be held as a Guarantee that in the event the Bid is accepted and a Contract awarded to the bidder, the Contract shall be duly executed and its performance properly secured. The successful bidder shall furnish and deliver to the Owner a performance and payment bond in the amount of 100 percent of the accepted bid amount as security for the faithful performance and payment of the Contract. Further, the successful bidder must furnish the policies or Certificates of Insurance required by the Contract. In default thereof, said checks and the amount represented thereby will be forfeited to the aforesaid Owner as liquidated damages. Bids must be accompanied, in the case of corporations not chartered in New Jersey, by proper certificate that such corporation is authorized to do business in the State of New Jersey. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 regarding equal employment opportunity, as amended. All corporations and partnerships must comply with Chapter 33, of the P.L. of 1977, regarding disclosure of partners and stockholders. The successful bidder will be required to comply with all provisions of prevailing wage rates as determined by the New Jersey Department of Labor. All bids shall be irrevocable, not subject to withdrawal and shall stand available for a period of sixty (60) days. The Owner reserves the right to reject any and all bids, to waive informalities or irregularities in the bids received and to accept the bid from the lowest responsible bidder. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Playgrounds / Parks / Athletic Fields

$273,000.00

Public - City

Site Work

8

9

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
548
Active Projects
323
Bidding Soon
5,258
All Active Projects
2,301
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2023

December 11, 2023

img_map_placeholder

Franklin Ave, Hawthorne, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Franklin Field Lighting Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.