BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Maple, Ontario. Contact the soliciting agency for additional information.

Consulting Service for the Preparation of Kipling Avenue and Woodbridge Centre Land Use and Implementing Plan for the City of Vaughan Detailed Work Plan and Project Timeline The Consultant will be responsible for working with staff to prepare a more refined finalized work plan and timeline prior to commencing the project. This will confirm the study deliverables. The ability to meet the study timelines, as outlined in Section 7, will be considered in the evaluation of all Proposals. The finalized work plan shall be provided approximately one week post project kick-off. Draft and Final Land Use Study and Plan The Land Use Study will include the study requirements identified in Section 3.3.3. This will form the basis and justification for potential Official Plan Amendments. The Study should include the following: i. Background Review ii. Principles, goals, and objectives for the Study iii. Study Methodology iv. Summary and results of the consultation process v. Observations, conclusions, and recommendations A draft Land Use Study must be provided for review and consultation, prior to finalization of the Study. Official Plan Amendment(s) If required as a result of the Land Use Study, the Consultant will be responsible for preparing a draft Official Plan Amendment(s), in the City's format, suitable for adoption by Vaughan Council, which includes a basis section, and policies and plans/schedules required for the implementation of the Study. Communications and Meeting Material The Consultant shall be responsible for preparing communications and meeting material as part of the stakeholder engagement process including, but not limited to, the following engagement events: i. Open Houses ii. Public Meetings iii. Councillor meetings and presentations iv. Indigenous engagement events v. Landowner group meetings Materials will include, but are not limited to: Presentation materials Maps and graphics Draft notices, memos, news articles, letters Display boards Meeting agendas and minutes Web content Additional communications materials, as required Question Deadline: Mon Oct 9, 2023 3:00:00 PM (EDT) Bid Pricing: $20.00 - Download Only The method of Contractor Selection has not been Determined at this time

Conceptual

Retail

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
107
Bidding Soon
2,475
All Active Projects
941
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2024

img_map_placeholder

Multiple Locations, Maple, ON

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.