BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Kalamazoo, Michigan. Completed plans call for site work for a water / sewer project.

It is the intent of these plans and specifications to provide for a contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for Tank Level Control Valve Replacement at Gull Water Tower and Beech Water Tower as described in the specifications and bid document. The project involves the replacement of existing altitude valves and associated fittings at two water towers with new motor actuated butterfly valves and associated pipe and fittings as provided in these specifications, drawings and as detailed on the included Harold Beck and Sons, Inc, Quotes # RLG-23-151806 and RLG-23-151808. Alternative valves and/or actuators shall not be allowed. Contractor is responsible for: All removals; Purchase and installation of the new actuated butterfly valves, supports, pipe and fittings, including disinfection of all pipes, fittings and valves immediately before installation; Disposing/recycling all removed valves, pipe, fittings, etc.; Providing all necessary equipment, labor and supplies to complete the project; Verifying the weight of existing valves prior to beginning the work and ensuring provided equipment is capable of safely lifting, transporting and loading existing valves, etc.; Verifying the accuracy of all measurements and ensuring that supplied and installed equipment is in compliance with project specifications and drawings and City of Kalamazoo Standard Specifications for Water Main and Service Installation 2021; and Cutsheets shall be provided to City for review and approved by the City prior to Contractor mobilization. Upon completion of an acceptable pressure test, the City will perform bacteriological sampling of installed pipe and fittings (at no cost to the Contractor). Contractor is responsible for re-disinfecting and flushing until acceptable bacteriological sample results are obtained. City will perform all electrical work. Questions about this IFB should be directed to: Department Contact: Eric Sajtar, P.E., Senior Civil Engineer at sajtare@kalamazoocity.org Keeping the water towers in service during construction is preferred. If this is not possible, the Contractor shall conduct their work in such a manner that each water tower is offline for no longer than one week each, including 72 hours for sampling and analysis. In no event, shall both water towers be offline at the same time. Work shall be completed before April 1, 2024 or between November 1, 2024 and December 13, 2024 Questions may be emailed to Eric Sajtar at sajtare@kalamazoocity.org by 10:00 a.m. on October 11, 2023. Questions regarding terms, conditions and other related bid requirements may be addressed to Kyle Dunn, Buyer at (269) 337-8720 or email dunnk@kalamzoocity.org.

Award

Water / Sewer

$75,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
33
Bidding Soon
717
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

April 1, 2024

img_map_placeholder

Multiple Locations, Kalamazoo, MI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.