Site work, remodeling and renovation of a playground / park / athletic field in Monrovia, California. Completed plans call for the remodel of a playground / park / athletic field.

**As of March 21, 2024 project was awarded to Pokrajac Corp, awarded amount is $12,095,217,11.** The Project Includes: Demolition of saw-cut and removal of existing: concrete, curb and gutter, headwall, gutter pan. Saw-cut and removal of existing: AC pavement, AC patch, AC Berm, AC pulverization, Cold milling of AC pavement. Remove trees, and tree stomps, cold mill AC pavement, excavation, and grading for all structures in the project. Remove chain link fence, wheel stops, AC pavement, AC pavement at parking lots, curbs, curb, and gutter, remove and salvage signs. Demolition of existing septic tanks, removal of existing sewer line clean outs and access boxes, concrete slabs at education area. Construction of: AC pavement rubberized w/fibers, AC pavement, Chip Seal, concrete curb, curb and gutter, concrete pavement, drive approach, sidewalk, spandrel, concrete pavement, mountable curb, Cross gutter, concrete v-ditch, concrete bench, concrete raised platform, concrete stairway, ADA ramps, concrete walls, concrete slope protection, rock wall, concrete headwall, concrete retaining walls. Water Improvements: 6" ductile iron pipe, pipe fittings, pipe elbows and bends, gate valves, fire hydrant assemblies, water service assemblies, water services, trenching for pipe, AC patch, adjust manholes, adjust utilities apparatus, abandon pipe cut and plug, relocate fire hydrant assembly, pothole for utilities, ductile iron manifolds, water booster pump, booster pump electrical control, electrical service for booster pump, booster pump building, water fountains, pipeline pressure testing and disinfectant. Sewer Improvement including new sewer lines made of HDPE, sewer manholes, sewer line connections, box culvert crossovers, sewer lift station, electrical service for lift station, electrical control panel for lift station, enclosure for lift station electrical controller, potholing of utilities, sewer bypass and dewatering. Relocation of existing k-rails, viewing devices, repair rock stairway, barrier gates w/chain, Ranger Kiosk Remodel, new wood railing at box culverts, new wood railing at view area, new chain link fence w/top rail, electrical conduit and wiring at education area, lighting poles, concrete seat walls with stone veneer, raised concrete platform with stone veneer and concrete seat caps. Striping and signage, SWPPP and erosion control implementation, construction staging and traffic control, public notification, pedestrian, and vehicular access, protect in place existing structures, mobilization, demobilization, bond, and insurance. The Engineer's Estimate for this project is $ 7,202,894.50

Award

Playgrounds / Parks / Athletic Fields

$12,095,217.00

Public - City

Remodeling, Renovation, Site Work

54

6

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
532
Active Projects
263
Bidding Soon
3,742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.