BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Shoreline, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

This Contract provides for the Phase 1 improvement of the 145th Street (SR 523) corridor within the City of Shoreline, WSDOT and City of Seattle right-of-way limits. The roadway corridor will be widened and will include signalized intersection improvements, new traffic signals, signal timing modifications, new sidewalk, curb ramps, landscaping, bus zones, pavement markings and urban design treatments. Overhead utilities will be relocated underground for a portion of the corridor, storm drainage and water improvements will be installed, and other work. Work includes installing temporary erosion control measures; removing existing concrete and asphalt pavements and other roadway features; clearing and grubbing and mass grading (excavation and embankments) of roadway corridors; installing concrete retaining walls with barrier, fencing, and drains; grading with gravel borrow; replacing existing sanitary sewer and potable water mains; installing temporary illumination and traffic signals and permanent street lighting; installing stormwater systems for collection, conveyance, treatment, and detention of road runoff; relocating existing and installing power system duct banks and utility vaults; soldier pile and cast-in-place concrete retaining walls; assisting Lumen with its relocation of existing communication duct banks and utility vaults; surfacing with crushed surfacing materials; installing cement concrete curbs, gutters, sidewalks, ADA ramp facilities, driveways, and multi-lane roundabouts; paving with asphalt and concrete pavements; installing guardrail, barriers, and chain link fence; pavement markings; permanent signing; landscaping; adjusting existing surface features; trimming and cleanup; traffic control; and performing roadway, structure, and licensed surveying, and other work The estimated construction cost range is $30,000,000 to $32,000,000 The time for completion of work is within 403 working days of the date appearing on the "Notice to Proceed". This Contract involves "public work". Workers performing work in conjunction with the Contract shall receive a prevailing rate of wage pursuant to the Prevailing Wages on Public Works Act (Chapter 39.12 RCW). Each bid must be accompanied by a certified check, cashier's check or surety company bid bond, on a form acceptable to the City, from a State-licensed Surety Company as surety, in an amount not less than five percent (5%) of the bid amount, payable to the City of Shoreline. A Performance Bond and Payment Bond, each in the amount of 100% project must be submitted by the Successful Low Bidder (herein after "Contractor") upon project award. The City expressly reserves the right to cancel the invitation to bid prior to the submittal deadline, reject any or all bids, and the right to waive any informalities or irregularities and to further award the project to the lowest, responsive bidder as it best serves the interest of the City. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All technical questions regarding this project are to be submitted in writing, via email, no later than 3:00 P.M. Tuesday, October 10, 2023. FHWA Project No. STPUL-0523(011) FHWA Project No. WSDOT Mobility Project No. PTD0420 TIB Project No. 8-1-202(008)-1 TIB Project No. 8-1-202(009)-1

Bid Results

Sidewalks / Parking Lot

$38,199,744.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
82
Bidding Soon
2,301
All Active Projects
716
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 14, 2023

January 8, 2024

June 23, 2025

img_map_placeholder

N 145th St, Shoreline, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.