BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a mixed-use development in Auburn Univ, Alabama. Completed plans call for the demolition of a educational facility; for site work for a educational facility; water / sewer project; and water / sewer project.

The general scope of the work includes but is not limited to: Scope of work includes the re-alignment, regrading, and restoration of an approximately 330 linear foot section of a tributary to Parkerson Mill Creek within the Patterson Greenhouse complex on the campus of Auburn University. New channel controls, slope stabilization, and new plantings are proposed along with all associated tree clearing, selective demolition, and erosion control practices required to facilitate the project. Removal and replacement of an existing sanitary sewer line that has been exposed due to erosion of the existing stream channel is also proposed. In accordance with Code of Alabama, 39-2-2(a), prequalification is required for this project. The prequalification application is available on the Auburn University Public Works A certified check or bid bond payable to Auburn University in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00, must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract For all questions or inquiries about this project, please contact: Nikki Preston, nikki.preston@auburn.edu; 334-734-1294

Bid Results

Educational

$251,125.00

Public - State/Provincial

Demolition, Site Work

17

16

12

6

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
28
Bidding Soon
571
All Active Projects
240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

img_map_placeholder

450 Duncan Dr, Auburn Univ, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.