BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Quebec, Quebec. Completed plans call for the renovation of a educational facility.

Reference number : 1765695 Deadline for receiving complaints: 2023-10-20 Electronically transmitted submission accepted: No Expected duration of the contract without options (in months): 4 The Cegep de Sainte-Foy is issuing a call for tenders to obtain services related to the Upgrading of sports facilities - Phases 3.1, 4 and 5 A visit is planned for October 2 at 9:30 a.m. at 2410 Chemin Ste-Foy in Quebec. Please report to door #4, Security. Please note that this visit is non-obligatory but strongly recommended. *Architecture : Dismantling, storage and recovery of existing elements. Supply and installation of dust screens and temporary safe partitions. Demolition of interior masonry, plaster or gypsum partitions, etc. Demolition of doors and frames; Demolition of interior ceilings (gypsum, plaster, acoustic tiles, etc.); Demolition of existing furniture; Demolition of floor coverings, walls and ceilings; Demolition of elements in asbestos and lead conditions; Construction of new partitions; Supply and installation of new wall, floor and ceiling finishes; Supply and installation of toilet room accessories; Leveling different elements of the building: floor, concrete block and Placoplâtre walls, ceilings, etc.; Floor leveling; Painting work (walls, ceilings, exposed structural elements and exposed mechanical pipes; Execution of all temporary work required for the completion of this work. These temporary installations must be safe, given the context in which these installations must be used (college environment in operation); Daily cleaning and maintenance of the site clean and free of all waste and dust; Final cleaning of the work. *Structure : New breakthroughs for electromechanics; New screeds and patching of existing floor; New exterior cladding supports; *Fire protection : Modifications to the existing network in the premises of this phase; All other work described implicitly or explicitly in the plans and specifications *Plumbing-heating: Connection of equipment supplied by others and by the contractor Demolition and new heating cabinets on the outskirts Hydraulic balancing; Demolition and construction of partial sanitary drainage, vent and domestic water distribution networks; All other work described implicitly or explicitly in the plans and specifications. *Ventilation : Air balancing; Addition and modification of the aeraulic network in the premises concerned; All other work described implicitly or explicitly in the plans and specifications; *Automatic regulation: Takeover in the new premises; All other work described implicitly or explicitly in the plans and specifications. *Electricity : Demolition; Temporary site power supply; New lighting; Supply of new services; Modification to the fire alarm; Supply and installation of sockets and services according to new needs; Connection of equipment supplied by others; Supply and installation of structured cabling; Supply and installation of access control; All other work described implicitly or explicitly in the plans and specifications. *** Start of Work ; May 13, 2024 & End of work ; August 16,2023 **** ( From Document )

Award

Educational

$3,018,940.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
33
Bidding Soon
576
All Active Projects
260
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2023

May 13, 2024

img_map_placeholder

2410 Ch Ste-Foy, Quebec, QC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.