Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Murray, Utah. Completed plans call for the renovation of a educational facility.
1. Granite School District is requesting bid proposals from qualified Contractors to perform the following contracting services for a Capital Project. These are ESSER funded projects that require the Contractor's bid submission to include and adhere to the Davis Bacon requirements for federally funded projects. This includes, but is not limited to, the expectation that work is paid at the federal level prevailing wage by contractors involved in the project. 2. Granite School District is requesting bid proposals from qualified Contractors to perform the following contracting services for a Capital Project. A brief overview of the project is as follows: a. Cooling System Upgrade - The school's original cooling was using a direct/indirect evaporative system. The intent of this project is to replace the original system by adding a water-cooled chiller using a chilled water loop to an existing cooling coil in the air handlers. The school's original basis of design included the future addition of a chiller to provide cooling. As a result, several of the existing cooling system components will be recommissioned for use by the new CHW cooling upgrade. b. Water-Cooled Mag-Bearing Chiller - Due to the anticipated long lead time, the chiller will be Owner Furnished - Contractor Installed. The intent will be for the chiller to be immediately ready and available for installation when required. Once the contractor is ready for the delivery of the chiller, a 14-day notice is to be submitted the Owner to request delivery. The anticipated date of chiller availability is March 01, 2024. The contractor will be required to submit a request to Owner 14 days prior to coordinate the delivery of chiller. The chiller will be delivered and set in place using a Rigging Contractor under a separate contract to this project Electrical system services including wiring and other electrical maintenance including HVAC construction and maintenance and installation and mechanical and machine installation and repair services Woodstock Elementary School 6015 South 1300 East Murray, Utah 84121 Question Submission Close Date 10/2/2023 2:00 PM MDT The anticipated date of chiller availability is March 01, 2024 The anticipated start date of construction is November 01, 2023. The date of Substantial Completion is April 31, 2024 Liquidated Damages - Granite School District will assess $250, per calendar day, as liquidated damages for the late completion of the project.
Award
Educational
$850,004.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
October 5, 2023
November 1, 2023
April 30, 2024
6015 S 1300 E, Murray, UT
Related To This Project
Murray, UT
Bid Date: Oct 24 2023
Murray, UT
Bid Date: Oct 28 2021
Murray, UT
Bid Date: Jun 30 2021
Murray, UT
Bid Date: Nov 20 2023
Murray, UT
Bid Date: Nov 29 2023
Murray, UT
Bid Date: Apr 09 2019
Murray, UT
Bid Date: Nov 04 2020
Murray, UT
Bid Date: Oct 18 2023
Murray, UT
Bid Date: Sep 22 2023
Murray, UT
Bid Date: Oct 12 2023
Murray, UT
Bid Date: Mar 03 2022
Murray, UT
Bid Date: Feb 03 2022
Murray, UT
Bid Date: Nov 08 2019
Murray, UT
Bid Date: Oct 25 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--