BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Hot Springs National Park, Arkansas. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Any questions or requests for clarification concerning the bid or bid specifications may be made on the ARBID website, in person, by phone, by electronic mail, or in writing to the City of Hot Springs, Purchasing Division, PO Box 6300, Hot Springs, AR 71902; or 324 Malvern, Hot Springs, AR 71901, (501) 321- 6830, or emailed to purchasing@cityhs.net. Any such questions or requests must be submitted not less than five (5) working days prior to the bid opening date. Should the question(s) pose substantial issues, the City may ask that they be submitted in writing. If such an inquiry results in a change in the bid or the specifications, such change will be put in writing, time permitting, and provided to all those who have received the bid request. This procedure shall be followed in order to ensure competitive fairness by providing all prospective bidders with the same information. Bidders should rely on written information (as opposed to verbal information) in preparing bids Structure Demolition and Brush Piles Relocation 1. Except as otherwise provided herein, all buildings and structures including retaining and foundation walls, steps, piers, all sidewalks, driveways (from sidewalk to street), and other artificial objects and obstructions shall be completely razed and removed to a depth of at least one foot below ground level. 2. Wells, cisterns, cesspools, outdoor toilets, basements, cellars, septic tanks, etc., and holes and trenches resulting from demolition and removal shall be filled to the ground surface. Rock materials from masonry construction may be used in the backfilling up to a depth of one foot below theground surface if sufficient fine materials are mixed therewith to fill the voids. Underground tanks are to be removed and the areas filled. Dirt shall be used for the top one (1) foot of the backfill. For rough grading, rock materials from masonry construction with a maximum dimension of nine inches may be used in all except the top one foot of the fill, provided such rock and materials are well distributed in the earth. All fill material shall be free from trash, wood, pipe, and debris. 3. The Contractor shall, after clearing the property, grade and clear the property so as to allow for complete run-off of surface water and ensure that there are no broken boards, rock, concrete, masonry pieces, debris or stumps of any kind that would prevent or hinder mowing of the property. The property shall be left in a hazard-free condition. All brush piles at 501 Vernel and 517 Vernel, Hot Springs Fire Department (HSFD) Training Grounds, shall be relocated to one spot at 517 Vernel. 4. Masonry walls shall be demolished in small sections. Structural steel, cast iron, and heavy timbers shall be removed by individual pieces and lowered carefully. All floor construction over basements and cellars shall be removed, regardless of elevation. 5. Masonry floors in basements, cellars, and other such below-ground facilities shall be broken into pieces not to exceed nine inches in diameter. All open cellars or basements shall be barricaded until backfilled to prevent injuries and accidents. No basement or other below-ground facilities shall be backfilled until it and the backfilled materials have been inspected and approved by an authorized City of Hot Springs representative.

Award

Residential Subdivision

$25,525.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
14
Bidding Soon
270
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2023

December 6, 2023

img_map_placeholder

501 Vernel Street,, Hot Springs National Park, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.