This is a service / maintenance or supply contract in Nain, Newfoundland. Contact the soliciting agency for additional information.

The Nunatsiavut Government is planning to build a new certified airport for the Inuit Community of Nain, NL to replace the existing airport infrastructure that is currently under stress from the effects of climate change. The new site will have a gravel airstrip measuring 5000 ft in length and 100 ft in width, exclusive of the manoeuvring areas, with a surface area of approximately 1300 m² set aside for future development. The New Airport will operate 24 hours a day, 7 days a week, to serve the local population during all seasons and will act as the centre for emergency response for the region. The construction of an access road to connect Nain to the New Airport is part of the Project. The Project is presently at the stage of feasibility studies which should be completed by the end of 2024. As part of this stage, data will be collected and feasibility studies will be carried out, in particular the following studies will be conducted: R1 – Weather Station and collect data (phase 1) R2 – Topographic survey R3 – Environmental Review - Desktop Assessment R4 – Surficial geology, geomorphology, permafrost and hydrogeological investigations R5 – Weather studies and report (phase 2) R6 – Hydrological study R7 – Electrical Power Supply Alternatives R8 – Preliminary engineering services R9 – Preliminary architectural design services R10 – Construction and supply strategy R11 – Cost estimation R12 – Environmental Impact Assessment NG is currently seeking proposals to provide Construction and supply strategy (R10) Project delivery mode strategy of the Project and affected areas, considering that the Project is at the feasibility study stage. The successful Proponent will be responsible to advise the NG of a delivery mode strategy that would allow for a fast-tracked project delivery of Nain’s new airport relocation, including required roads, and other infrastructure required to deliver a full operational airport, safe, sustainable, and, in compliance with the applicable laws and regulatory authorities. Duration: 1 year Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Transportation Terminals

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
7
All Active Projects
2
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 10, 2024

July 10, 2025

img_map_placeholder

7 Middle Path, Nain, NL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.