BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2023 at 7:00 PM

Updated January 7, 2026

Site work for a water / sewer project in Glen Allan, Mississippi. Completed plans call for site work for a water / sewer project.

The Project includes wastewater pumps, generators, SCADA and AMR equipment for Glen Allan Utility Districts system in Washington County. The Project has an expected duration of 540 days. For questions related to the online bidding process, please contact Plan House Bidding Group (662-407-0193). Bid security in the form of a Bid Bond, certified check, or cashiers check in an amount equal to five percent (5%) of the Bid shall be furnished by each Bidder as required by the Contract Documents. Washington County Board of Supervisors reserves the right to reject any and all Bids and to waive any and all informalities, and reserves the right to hold all Bids for examination for a period not to exceed sixty (60) days and to award Contract to the lowest and best Bid complying with the Plans and Specifications within said time. Funding for the project is through a Mississippi Municipal and County Water Infrastructure (MCWI) Grant. Contractor shall conform to the grant requirement. Every request for such interpretation should be in writing addressed to the Engineer and to be given consideration must be received at least five (5) days prior to the date fixed for the opening of bids. Question Deadline 10/31/2023

Award

Water / Sewer

$327,000.00

Public - County

Site Work

9

14

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
1
Bidding Soon
181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2023

December 7, 2023

Project location map

Multiple Locations, Glen Allan, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.