BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 1, 2023 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a water / sewer project in Franklin, Idaho. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project includes the following Work: The project is intended to improve the Franklin Wastewater Treatment Plant by constructing a screening building and install the mechanical screen and supporting equipment. Bids are requested for the following Contract: Screen Building The Project has an expected duration of 180 working days. Upon purchase of the Contract Documents, Bidders will be placed on the plan holders list. Acknowledgment on the plan holders list is mandatory for all bidders. Make checks for Bidding Documents payable to Forsgren Associates, Inc. Instructions to Bidders. Each proposal must be submitted on the prescribed form and accompanied by Bid Security in the form of a certified cashier's check, or a corporate bid bond executed on the prescribed form, payable to the City of Franklin in the amount of five percent (5%) of the amount bid. The successful bidder will be required to furnish Performance and Payment Bonds, each in the amount not less than 100% of the contract price. All questions relating to this project prior to the opening of bids shall be directed, in writing, to the ENGINEER for the project. It shall be understood, however, that no interpretations of the specifications will be made by telephone. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the Unit- ed States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
11
Bidding Soon
360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

November 16, 2023

Project location map

To Be Determined, Franklin, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.