BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Madison, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

District: 05, 07, 11, 20, This contractor shall be required to coordinate with the other contractors performing work on the resurfacing program contracts. Work in this contract includes replacement of curb and gutter, drive aprons, sidewalk ramps including truncated domes (supplied by City of Madison), adjusting inlets and castings (castings supplied by City of Madison), and installation of new storm sewer in advance of pavement pulverizing/milling and paving. All curb and gutter replaced on milled streets shall be front filled with asphalt. All curb & gutter placed on pulverized streets shall be front filled with gravel unless the Engineer requires asphalt. Gravel front fill is included with remove/replace curb and gutter. New storm sewer installation on: PILGRIM RD MCKENNA BLVD PUTNAM RD STRATFORD DR MAPLE GROVE DR All sidewalk removed at the crosswalks shall be replaced with 7" concrete. This Contractor shall be required to coordinate with the other Contractors performing work on the resurfacing program contracts

Award

Roads / Highways

$1,093,645.00

Public - City

Paving, Site Work

19

5

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
58
Bidding Soon
840
All Active Projects
327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2024

May 13, 2024

img_map_placeholder

Multiple Locations, Madison, WI

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.