BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Bowling Green, Kentucky. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project is targeted to maintain sidewalks throughout the city in as good of a condition as possible to provide a pedestrian transportation alternative. The emphasis is on replacement of broken, uneven sidewalks and/or curb and gutter in need of rehabilitation to reduce tort liability and routine maintenance costs. Additionally, staff inspect and recommend improvements that will allow for ADA compliance according to federal standards. A GIS application enables staff to conduct a more efficient and thorough process to identify and prioritize areas with potential trip hazards and ADA compliance issues along existing city sidewalk segments. In 2016, the entire network of sidewalks and ramps within the city was inspected. Since that time, the city has been divided into "sidewalk zones" in an effort to allow for annual inspection and rehabilitation efforts within each zone as funds allow. The focus of the evaluation is to identify trip/safety hazards, missing, and/or severely damaged sidewalk segments as well as ADA compliance issues. These funds will be used to address the repairs utilizing both in-house staff (Operations Division Concrete Crew) and with outside contractors. As of April 3, 2024, the project is included in the City's 2024-2027 Capital Improvement Program (CIP). Per owner, an engineer has been selected. They are currently in the process of completing all necessary property acquisition. This should be complete by end of April and then they will advertise for the construction bid. Construction is expected to begin in late Spring/early Summer 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Sidewalks / Parking Lot

$2,736,182.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
38
Bidding Soon
694
All Active Projects
283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

img_map_placeholder

To Be Determined, Bowling Green, KY

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.