Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Bowling Green, Kentucky. Conceptual plans call for site work for a water / sewer project.

The Stormwater Mitigation Program was established in FY2011 to address flooding that impacts private property or public infrastructure. Construction projects are screened against set criteria and prioritized. The intent is to improve the capacity of stormwater conveyance in the most needful areas throughout the city, improving drainage flow, safety and potentially reducing damage to residences and businesses. A total of 60 projects were identified at the onset of this program. New projects are added throughout the year and then prioritized among existing candidate projects at the beginning of each fiscal year based on established criteria and available funds. Projects could range from deepening an existing basin, to constructing a new retention basin, to any number of smaller projects such as ditching and/or piping. Costs depend greatly upon the site conditions, such as rock, level of protection desired (75-year storm, 100-year storm), and market conditions for bids. FY2021 and FY2022 funds will begin addressing mitigation needs identified from the rain event on February 28, 2021. Staff have identified 3 locations from this event and those include sections of Oaklawn Way, Fair Street, and Crewdson Drive. Projects funded with FY2023 funds will be determined later on in the fiscal year. As of October 26, 2023, the project is included in the City's 2022-2026 Capital Improvement Program (CIP). Per owner, there is no information to report at this time. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$800,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
173
Active Projects
92
Bidding Soon
1,223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

Project location map

To Be Determined, Bowling Green, KY


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed