BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 10, 2025 at 7:00 PM

Updated November 11, 2025

Site work, new construction and renovation of a mixed-use development in Comstock, Texas. Completed plans call for the renovation of a 5,386-square-foot playground / park / athletic field; for site work for a water / sewer project; and for the construction of a 5,200-square-foot playground / park / athletic field.

Provide construction project schedule using the critical path method to furnish all labor, equipment, materials, and incidentals necessary for construction of the Base Proposal: Project shall be completed in two (2) Construction Phases, Phase 1 includes all work associated with Roadrunner Flat's, New Restroom and Camp Loop Utilities. Phase 2 includes all work associated with Headquarters and Desert Vista Restroom. The contractor is responsible for providing a temporary Headquarters Trailer during Phase 2 for park staff until construction is competed at the Headquarters Building. Project has been Rebid. Headquarters Repairs, Utility System Installation and Restroom Replacement Class & Item Codes: 914-38, 50, 68, 84 Seminole Canyon State Park & Historic site is located forty (40) miles west of Del Rio, Texas on U.S. Highway 90, just east of the Pecos River Bridge. The physical address is 434 Park Road 67, Comstock, Texas 78837 Bid values are undisclosed Renovation of the Headquarters/Visitor Center Building and Site Improvements, Installation of water and electrical to the fourteen (14) camping sites at The Roadrunner Flats Camping Area, construction of New Restroom at Roadrunner Flats, and demolition and replacement of the Desert Vista Camping Area Restroom. Project No. 1110206 shall be completed in two (2) Construction Phases, Phase 1 includes all work associated with Roadrunner Flat's, New Restroom and Camp Loop Utilities. Phase 2 includes all work associated with Headquarters and Desert Vista Restroom. The contractor is responsible for providing a temporary Headquarters Trailer during Phase 2 for park staff until construction is competed at the Headquarters Building. Deadline to Submit Questions 5:00 PM CST, December 13, 2024 All emailed inquiries must include company name, contact person, title, phone number and email address. Primary Point of Contact: Mindi Johnson, CTCD | CTCM, Contract Manager Email: mindi.johnson@tpwd.texas.gov Phone: (512) 389-8282 TPWD | Infrastructure Division 4200 Smith School Road Austin, Texas 78744 If a response to an inquiry has not been received within seventy-two (72) business hours, forward the inquiry to infcontracting@tpwd.texas.gov. HUB Subcontracting Goal: 32.9% Contract time is of the essence and all Work shall be substantially completed within the performance period of nine hundred thirteen (913) calendar days from written effective date of Notice to Proceed. The project will be completed in two (2) Construction Phases: (Phase 1 includes work all associated with the Roadrunner Flat's, New Restroom and Camp Loop Utilities; Phase 2 includes all work associated with Headquarters / Visitor Center building and site improvements , to demolition and replacement of the Desert Vista camping area restroom, - Furnish Temporary Trailer for Park Headquarters building) Phase I will need to be completed prior to starting work on Phase 2.

Award

Playgrounds / Parks / Athletic Fields

$7,072,000.00

Public - State/Provincial

New Construction, Renovation, Site Work

102

51

2

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
0
Bidding Soon
29
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

August 1, 2025

Project location map

US-90, Comstock, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.