BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Millsboro, Delaware. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; water / sewer project; and water / sewer project.

The improvements consist of furnishing all labor and materials for this project. The scope consists of a grade separation at the US 113/ SR 20 intersection located just north of Millsboro, Delaware. The grade separation includes a partial cloverleaf configuration with loop ramps in the northeast and southwest quadrants with signals at the ramp terminals, a bridge structure, drainage improvements, and multimodal facilities. Also, unsignalized median crossovers will be removed on US 113 south of the US 113/ SR 20 intersection within the project's limits. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Pre-bid meeting: no Ojt trainees: two (2) see prospective bidder's notes and posted ojt manual for details. Location: sussex county These improvements are more specifically shown on the location map(s) of the attached plans. Completion time: all work on this contract must be complete within 597 calendar days. Extensions of contract time due to weather are specified in the standard specifications section 108.7f, weather days. It is estimated a notice to proceed is issued such that work starts on or about January 2, 2024. Question Deadline 10/18/2023 at 2:00 PM ET QUESTIONS: E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Surety bond - each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. Performance-based rating system - 29 del.C. 6962 (c)(12)(a) requires deldot to include a performance-based rating system for contractors. The performance rating for each contractor shall be used as a prequalification to bid at the time of bid. Refer to 'general notices' for details. DEDOT - US 113 at SR 20 Grade Separated Intersection CFDA: 20.205

Bid Results

Bridges / Tunnels

$31,657,890.00

Public - State/Provincial

Paving, Site Work

543

18

6

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
27
Bidding Soon
602
All Active Projects
242
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

January 2, 2024

img_map_placeholder

US-113 & State Rd 20, Millsboro, DE

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.