BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Fairfax, Missouri. Contact the soliciting agency for additional information.

At a minimum, the Feasibility Study will consist of the following: 1) document existing wastewater treatment systems in the study area, including operation and maintenance issues, compliance, and condition of both treatment facilities and collection systems - inflow and infiltration will be documented by a comparison of design capacity and metered flow; 2) investigate future wastewater needs in the project area based on reasonably anticipated growth patterns; 3) examine individual and collective wastewater treatment alternatives including capacity, preliminary or conceptual layouts, and cost estimates(both capital and operating costs) for compliance with local, state, and federal government requirements including the National Pollutant Discharge Elimination System program under the Clean Water Act; 4) if applicable, examine regional wastewater management organizational structure options for continuing authority to operate wastewater facilities and outline organizational and staffing requirements for each option considered; 5) describe financing options; 6) project positive effect, if any, of improved wastewater treatment on the local and regional environment and economy; 7) offer a conclusion with a proposed alternative that is the most feasible, economic, and protective alternative; 8) outline of major steps to implement the recommended alternative and; 9) conduct public education and seek public input by hosting up to nine town hall meetings. In addition, the NWMORCOG will partner with Missouri Rural Water Association to provide wastewater treatment training to assist local officials with a better understanding of each community's wastewater treatment facility and operating permit. Finally, the NWMORCOG with the engineering firm may arrange for local officials' visits with neighboring wastewater facilities that have undergone similar upgrades to those recommended in the feasibility study. Project products will include: 1. A draft feasibility study; 2. Documentation of training provided to local officials by the NWMORCOG and Missouri Rural Water Association; 3. A final feasibility study; and 4. Public outreach materials The Northwest Missouri Regional Council of Governments will work with the chosen engineering firm to refine the project timeline. It is anticipated the timeframe to complete the feasibility study is 12-15 months.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
36
Bidding Soon
604
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.