BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Flint, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000330959 Mott College is seeking a qualified contractor who has at least three (3) years familiarity with MCC campus to correct drainage issues at Mott's Family Life Center, located at 1509 East Court Street, Flint, MI, basement floor, located next to the main campus. Delivery Point Main Campus 1401 East Court Street Flint, Michigan United States 48503 Question Acceptance Deadline 10/20/2023 02:00 PM EDT Questions are submitted online Yes -- MCC's Procurement Ocer and Project Manager will be present to answer questions regarding the scope of work and intent of the solicitation. General Requirements - FOB Destination - Installation Required - Insurance Required - License Required Award Requirements - All or None Award Lupe Aguilar Email Address guadalupe.aguilar@mcc.edu This scope of work for this project includes, but may not be limited to, the following information, drawings, technical specifications, and other attachments. 1. Contractor must have and be able to demonstrate a minimum of five (5) of successful experience completing the same or similar projects and/or scopes of work. 2. Contractor must have a minimum of three (3) years of familiarity with MCC main campus. 3. Contractor will assign a competent project manager who has full authority to act for the Contractor and who will be MCC's primary point of contact and coordination during the execution of the project. 4. Each basin (new and existing) have been labeled on Appendix B that is attached to this ITB. 5. Basin "A" has an existing connection to Basin "B" - clean this line to assure flow from A to B. 6. Basin "A" is an existing drainage structure - clean out silt from existing structure. 7. Basin "B" is an existing drainage structure - clean out silt from structure, install two (2) new horsepower sump pump in existing structure, install new 2" pvc sump line underground from Basin"B' to Basin "C", add new 4" x 4" treated post with power receptacle adjacent to Basin "B" for new sump pump power connection, connect receptacle into the electrical panel inside the FLC building. 8. Basin "C," install new 24" x 36" plastic sump basin with lid, receive pumped 2" pvc line from Basin "B", install new gravity pitched 4" pvc pipe from Basin "C" to existing drain "D," connect to Basin "D." 9. Inside the North side basement: cut concrete floor and install 24" x 30" new plastic sump basin "F" with lid, cut 10' along wall (east and west) of the new basin and install 4" drain tile with sock and backfill with pea stone, install 6 mil visqeen and reinstall the concrete around the basin and over the tile trench area. Install a new power outlet for plugging in sump pump, install new 1 horsepower sump pump, install "2" pvc sump discharge line with check valve from Basin "F" up overhead and connect to internal storm pipe that leads to Basin "E." 10. Inside the South side basement: cut concrete floor and install 24" x 30" new plastic sump Basin "G" with lid, cut 10' along wall (east and west) of the new basin and install 4" drain tile with sock and backfill with pea stone, install 6 mil visqeen and reinstall the concrete around the basin and over the tile trench area. Install a new power outlet for plugging in sump pump, install new 1 horsepower sump pump, install 2" pvc sump discharge line with check valve from Basin "G" - Core wall, run drain underground to Basin "B," patch and seal the wall penetration. 11. The work is to be performed during traditional work hours. Traditional hours of work are Monday through Friday from 8 AM to 5 PM E.S.T. Service Providers who need to operate outside of this period must receive prior approval from the Project Manager at least twenty-four hours in advance to allow for the notification of the appropriate personnel at MCC. The Project Manager must be notified in advance if there are any additional costs associated with a request to work outside of traditional work hours. 12. The Service Provider, its subcontractors, and agents will abide by all federal, state, and local laws, rules, and regulations related to fair labor practices, prohibiting discrimination in employment, and controlling workplace safety.

Award

Educational

$40,000.00

Public - County

Site Work

3

3

4

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
73
Bidding Soon
1,315
All Active Projects
536
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2023

November 27, 2023

img_map_placeholder

1509 E Court St, Flint, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.