BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Gilroy, California. Completed plans call for the renovation of a educational facility; for site work for a playground / park / athletic field; and 2,880-square-foot, one-story above grade pre-engineered storage facility.

A. Furnish all labor, materials, equipment, facilities, transportation and services to complete tree protection and related work as shown on the drawings and/or specified herein. B. Description of Work: 1. Protection of existing trees and vegetation to remain. 2. Trimming of existing trees. 3. Maintenance of existing trees and vegetation during construction. 4. Removal of existing trees and other vegetation. 5. Contractor shall retain the services of a certified arborist to perform work and/or make recommendations under conditions specified herein. C. Traffic: 1. Do not interfere with or close public ways without permission of the Owner's Representative. 2. Do not interfere with adjacent private properties without permission of the Owner's Representative. D. Site Utilities: 1. Advise utility companies of excavation activities before starting excavations. 2. Locate and identify underground utilities passing through work area before starting work. 3. In event unidentified underground utilities are encountered during work, advise utility owner immediately before proceeding. Add any new utility information to project record drawings for actual location. 4. Protect all existing-to-remain utilities. 5. Do not interrupt existing utilities without advance notice to and approval from the Owner Relocation of Districts surplus modular buildings (one - 72x40), playground surfacing, playground equipment, fabric shade structure, and site work to Antonio Del Buono Elementary to create a new preschool hub. Deadline for MEP subs to submit questions related to the Project: October 11, 2023 @ 2 pm Bids/RFI responses to questions: October 16, 2023 Prequalified Questionnaire due: October 18, 2023 @ 2 pm Announcement of prequalified subs: October 19, 2023 @ 2pm Planned Announcement of Evaluation Criteria Ranking: November 9, 2023

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$4,428,591.00

Public - City

Renovation, Site Work

59

19

16

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
71
Bidding Soon
1,350
All Active Projects
574
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

December 1, 2023

img_map_placeholder

245 Farrell Ave, Gilroy, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.