BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2024 at 7:00 PM

Updated February 28, 2024

Site work, paving and new construction of a mixed-use development in San Antonio, Texas. Completed plans call for the construction of a 141,000-square-foot bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and for site work for a development.

As of February 27, 2024 this project has not yet been awarded. A timeline for the award was not yet been established. The general scope of the project consists of improvements to two adjacent park properties, Al Rohde Park and the Buddy Calk Trailhead. Patrons have long since used one property to access the other and this project will connect the two with a pedestrian pathway and landscaping. Construction services include demolition, site work, shade structures, pedestrian bridge fabrication and installation, concrete flatwork, soil amendments, landscaping, trees and irrigation. Additive alternates include agility equipment and associated safety surfacing, and a concrete basketball court. The estimated construction budget for this contract is $650,000.00. The Deadline for questions is scheduled for February 8, 2024 at 4:00PM (CT). It is understood and agreed that the work is to be substantially completed on or before 180 calendar days AABE 4%

Post-Bid

Bridges / Tunnels

$560,000.00

Public - City

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

28

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
55
Bidding Soon
2,206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

March 25, 2024

Project location map

Multiple Locations, San Antonio, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.